35
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano GE315 • Issue 02/2006
3
System start-up
2.
Requirements Fluid Category 4 systems (fig see
right)
z
Control valve (stop valve) on the mains cold water
supply pipe
z
Strainer
z
Verifiable Backflow Prevention Device with reduced
pressure Zone (RPZ valve assembly) incorporating a
Type BA air gap
z
Tundish
z
Control valve (stop valve) on the heating system
pipework
z
Open the cap of the automatic air vent by one full turn
to allow air to escape.
z
Slowly fill the heating system. Observe the pressure
gauge whilst filling.
z
Close the water tap and the boiler drain valve once
the required operating pressure has been reached.
z
Bleed the system via the radiator bleed valves.
z
Top up with water if the pressure drops as a result of
bleeding the system.
z
Take the hose off the boiler drain valve.
z
Enquire from your installer, whether you can use your
public water untreated or whether you need to treat it
before filling your system.
z
Notify your installer, if you need to regularly add top-
up water to your system.
CAUTION!
SYSTEM DAMAGE
through frequent topping up.
z
The heating system may be damaged,
depending on water quality, by
corrosion or scaling if you frequently
need to top-up the heating water.
Fig. 51
Requirements Fluid Category 4 systems