8
Heating system inspection
Logano GB125 BE US/CA - Subject to technical modifications.
48
Condition-based maintenance
Page
Date:______
Date:______
Date:______
1.
Shut down the heating system
36
2.
Remove and clean heat exchanger baffles
38
3.
Clean the heat exchanger heater flue (heating surfaces) and combustion
chamber and afterwards reinstalling the heat exchanger baffles in original
positions
38
4.
Check seals/sealant ropes on burner door and burner and replace as neces-
sary
38
5.
Check and clean heat exchanger system, replace gaskets if necessary
38
6.
Combustion air supply and flue system
•
Clean air supply system
•
In the case of concentric combustion air supply and flue pipe, clean the
condensate outlet
38
7.
Start up the heating system
32
8.
Carry out final check of the maintenance work
9.
Check safe and proper operation
Confirm properly-completed servicing
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 17 Maintenance log book
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
8.
9.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 18 Maintenance log (continued)