8
Heating system inspection
Logano GB125 BE US/CA - Subject to technical modifications.
46
8.11 Inspection and maintenance reports
B
Initial and date the inspection operations completed.
The inspection and maintenance logs can also be used as
copy masters.
Inspection work
Page
Date:______
Date:______
Date:______
1.
Check general condition of the heating system
2.
Visual inspection and function check of the heat-
ing system
3.
Check fuel and water-carrying components of the
system for:
• Leaks during operation
• Leak test
• Visible signs of corrosion
• Signs of aging
4.
Check the combustion chamber and the heating
surface for contamination; shut down the system
for this step
36
5.
Check heat exchanger system for:
• Dirt contamination
• Damaged or hardened gaskets
40
6.
Check burner (
Æ
burner documentation)
7.
Check combustion air supply and flue system for:
• Function and safety
• Leaks
• Blockages in the air supply system
• In the case of a concentric combustion air sup-
ply and flue gas pipe, blockage of the conden-
sate outlet
Clean the condensate pipeline and siphon
8.
Clean the condensate line and siphon
42
9.
Check the operating pressure, relief valve and
expansion tank inlet pressure
44
10.
Check function of DHW hot water tank and anode
(
Æ
DHW hot water tank documentation)
11.
Check control panel settings (
Æ
control panel
documentation)
12.
Record the final checks of the inspection work,
incl. measurements and test results
Confirm properly-completed servicing
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Tab. 15 Inspection log book