Commissioning the heating system
5
Logamax plus GB162-65/80/100 - Subject to modifications resulting from technical improvements!
12
5
Commissioning the heating system
This chapter explains how you can start up your heating
system, e.g. after a holiday.
5.1
Checking and correcting the system pressure
If the heating system has been newly filled, the system
pressure must initially be checked every day, for 1 week.
The maximum pressure in the heating system, meas-
ured directly at the boiler, must not exceed 2.5 bar.
Switch on the mains switch (fig. 7,
item 1
) on the
BC10 (position "1").
Press the "Service" button (fig. 7,
item 4
) until the
system pressure ("
P1.6
") is shown in the display
item 9
). Also see section 6.1.1, "Normal
Operation menu", page 18.
Fill the heating system as follows if the system pressure
has dropped to below 1.0 bar:
Remove the lower casing from the connection group
(fig. 8).
fig. 7
BC10 basic controller
1
2
3
4
5
6
7
11
10
9
8
fig. 8
Removing the lower casing