For your safety
3
Logamax plus GB162-65/80/100 - Subject to modifications resulting from technical improvements!
8
3.7
Maintenance schedule
3.8
CE label
3.9
Abbreviations
CH (boiler) flow = Central Heating flow
CH return =
Central Heating return
DHW outlet=
Domestic Hot Water warm outlet
MCW inlet =
Mains Cold Water inlet
UBA 3 =
Universal Burner Automat 3
DAMAGE TO THE INSTALLATION
due to insufficient or improper cleaning and
maintenance.
Have the heating system inspected,
cleaned and serviced by a registered
Gas Safe installer once a year.
We advise you to enter into a contract for
annual inspection and maintenance.
The appliance complies with the basic
requirements of the relevant European
directives.
Conformity has been substantiated by the
proper documents which - together with the
declaration of conformity - are filed with the
manufacturer.