Permanent clearances
2
Logamax plus GB162-65/80/100 - Subject to modifications resulting from technical improvements!
6
2
Permanent clearances
The boiler must be located in an area with the following
permanent clearances.
50 mm
30 mm
250 mm
(with pump group)
0 mm
0 mm
The installer or service engineer must be able to create sufficient service clearences.
These clearences should have been considered at time of installation.