6 | Operation
Büchi Labortechnik AG
36/102
Operation Manual Pure Chromatography Instruments
Menu
Submenu / Action
Explanation
[Tools]
[Solvent Loading]
Assign a solvent to a solvent line.
See Chapter 5.7 "Assigning solvent to sol-
vent lines", page 26
[Solvent Definition]
Define solvents.
See Chapter 6.3 "Editing a solvent",
page 53
[Vapor Sensors and Limits]
Edit the vapor sensor sensitivity.
See Chapter 6.2.9 "Editing the vapor sen-
sor sensitivity", page 52
[Configuration]
System configurations.
[Calibration and Defaults]
Calibrate the screen.
Set time and date.
Reset UV lamp.
Calibrate solvent level sensors.
See Chapter 5.8 "Calibrating the solvent
level sensor", page 27
Calibrate the waste level sensor.
See Chapter 5.12 "Calibrating the waste
level sensor", page 29
Set alarms
[Manual control]
Maintenance actions.
See Chapter 7.6 "Cleaning the instru-
ment", page 77
See Chapter 7.7 "Cleaning the solid
loader", page 78
See Chapter 7.8 "Removing solvent from
an used cartridge", page 78
See Chapter 8.8 "Resetting the Fraction
collector arm", page 89
[NP<>RP]
Change back and forth between normal
phase and reverse phase
[Product Services]
(C-810 C-815 C-850 only)
Override max. pressure limit for car-
tridges.
[UV Baseline]
Adjust the baseline to zero during a run.
[Language]
Select a language.
[Service]
BUCHI service technicians only
[Help]
[About]
The display shows instrument details.
[View Manual]
The display shows the Operation manual.
All manuals and user guides at all-guides.com
Содержание Pure C-810
Страница 101: ...All manuals and user guides at all guides com ...