7.1 - Process Site Selection
M2041/5en
SBT-2400 Appendix
57
©BTG 2006
7.1.2
Vertical Pipe Installation
The following installation scenario is recommended.
Calculation example for a vertical pipe:
D = 200 mm
Cs = 3.5%, chemical pulp
V = 2.4 m/s
The nomogram shows a relative length (L/D)
7.5. The Mp constant is 1
and the Ic constant is also 1.
L
B
= L/D x D x Mp x Ic
L
B
= 7.5 x 200 x 1 x 1 = 1500 mm.
L
A
= 0,5 x L
B
L
A
= 750 mm
The recommended length upstream the transmitter is 1500 mm and the
recommended length downstream the transmitter is 750 mm.
≈
L
B
L
B
L
B
L
A
L
A
L
A
D
D
D
Fig
3 Transmitter
installation examples
Содержание Pulptec SBT-2400
Страница 1: ...USER MANUAL Pulptec BTG Pulp Paper Sensors AB SBT 2400 Static Blade Consistency Transmitter M2041 5en ...
Страница 12: ...1 4 Type Sign Explanation 6 SBT 2400 Product Introduction M2041 5en BTG 2006 ...
Страница 26: ...3 6 Mounting of Optional Accessories 20 SBT 2400 Installation Instructions M2041 5en BTG 2006 ...
Страница 58: ...5 4 Troubleshooting 52 SBT 2400 Service Instructions M2041 5en BTG 2006 ...