6
J. Factory Test and Inspections
1. Prior to shipment, final air-fuel adjustments
are performed by factory trained service
personnel on each unit. The factory emissions
report is posted on the back of the front jacket
panel for troubleshooting and maintenance
reference.
2. In addition, the following tests and inspections
are performed to ensure the appliance meets
our highest safety and performance standards:
Operating test
Construction inspection
Electrical components inspection
Crating inspection.
K. Disclaimers and Local Codes
1. Installation must conform to the requirements
of the authority having jurisdiction. In the
absence of such requirements, installation
must conform to the
National Fuel Gas Code,
NFPA 54/ANSI Z223.1, and/ or CAN/CGA B149
Installation Codes. Where required by the
authority having jurisdiction, the installation
must conform to the
Standard for Controls and
Safety Devices for Automatically Fired Boilers,
ANSI/ ASME CSD-1
.
2. Installation, start-up, and maintenance of this
equipment can be hazardous and requires
trained, qualified installers and service
personnel. Do not install, operate, service
or repair any components of this equipment
unless you are qualified and fully understand
all requirements and procedures.
3. This instruction manual is an integral part
of the product and must be retained by the
person in charge of the appliance operation,
and service and maintenance.
II. Read Before Processing
(continued)
Содержание BFIT 1000
Страница 9: ...9 Figure 1 BFIT MODEL 1000 2000 ...
Страница 12: ...12 IV BFIT Component Identification continued Figure 2 Component Identification ...
Страница 13: ...13 IV BFIT Component Identification continued Figure 3 Component Identification ...
Страница 52: ...52 Figure 24 Operating Instructions XII System Start up continued ...
Страница 66: ...66 APPENDIX D INLET OUTLET WATER AND FLUE OUTLET TEMPERATURE SENSOR RESISTANCE VOLTAGE CHART ...
Страница 68: ...68 ...