3-21
3.7.3 Removing the Roller Holder Assy
1. Move the Y-cutter arm L as far as possible to the left.
2. Lift up the roller holder assy and remove the roller holder spring.
3. Remove the two roller holder rings. Push the roller holder assy to the right to
disengage it from the chassis unit L boss shaft. Disengage the roller holder assy
from the chassis unit R boss shaft.
Fig. 3.7-3 Removing the Roller Holder Assy
Roller holder assy
Chassis unit L boss shaft
Roller holder ring
Roller holder rings
Chassis unit R boss
shaft
Y-cutter arm L
Содержание LX-200
Страница 1: ...SERVICE MANUAL MODEL LX 200 LX 900 LX 910D REVISED EDITION May 2000 ...
Страница 4: ...Chapter 1 SPECIFICATIONS ...
Страница 8: ...Chapter 2 MECHANISMS ...
Страница 18: ...Chapter 3 DISASSEMBLY PROCEDURES ...
Страница 60: ...Chapter 4 REASSEMBLY PROCEDURES ...
Страница 107: ...Chapter 5 ELECTRONIC CONTROLLERS ...
Страница 128: ...Chapter 6 MAINTENANCE ...
Страница 137: ...6 8 Y Diversion Lever E two positions Ring Y cutter guide shaft Y diversion lever assy Fig 6 1 14 Y Diversion Lever ...
Страница 151: ...Chapter 7 TROUBLESHOOTING ...
Страница 176: ...APP 1 Appendix Main PCB Circuit Diagram ...
Страница 177: ...May 2000 86S004BE3 Printed in Japan ...