4-35
5.Align the leaf switch R assy (red CN2) and the leaf switch L assy (white CN3) with the
boss holes and fasten them in position with the two leaf switch R/L screws.
6.Pull the plate spring in the direction of the arrow. Insert the dial switch B such that the
indicator is positioned between the two leaf switches.
Indicator
Dial switch B
Leaf switch R/L screws
Leaf switch L assy
(white CN3)
Leaf switch R assy
(red CN2)
Boss holes
Plate spring
Fig. 4.17-4 Reassembling the Dial Switch Holder Assy B (4)
4.17.2 Installing the Dial Switch Holder Assy B
1.Align the dial switch holder assy with the boss under the body cover and fasten it in
position with the two dial holder screws.
2.Attach the leaf switch R assy (red CN2) and leaf switch L assy (white CN3) harness
connectors to the switch PCB.
3.Install the switch harness assy (CN1) to the switch PCB.
4.Attach the dial lock arm spring between the dial lock arm and the lug on the body
cover.
Dial holder screws
Leaf switch L assy
Leaf switch R assy
Dial lock arm spring
Body cover lug
Dial lock arm
Dial switch
holder assy B
Boss
Fig. 4.17-5 Installing the Dial Switch Holder Assy B
Содержание LX-200
Страница 1: ...SERVICE MANUAL MODEL LX 200 LX 900 LX 910D REVISED EDITION May 2000 ...
Страница 4: ...Chapter 1 SPECIFICATIONS ...
Страница 8: ...Chapter 2 MECHANISMS ...
Страница 18: ...Chapter 3 DISASSEMBLY PROCEDURES ...
Страница 60: ...Chapter 4 REASSEMBLY PROCEDURES ...
Страница 107: ...Chapter 5 ELECTRONIC CONTROLLERS ...
Страница 128: ...Chapter 6 MAINTENANCE ...
Страница 137: ...6 8 Y Diversion Lever E two positions Ring Y cutter guide shaft Y diversion lever assy Fig 6 1 14 Y Diversion Lever ...
Страница 151: ...Chapter 7 TROUBLESHOOTING ...
Страница 176: ...APP 1 Appendix Main PCB Circuit Diagram ...
Страница 177: ...May 2000 86S004BE3 Printed in Japan ...