
200747_1TB
3
Introduction
THANK YOU FOR PURCHASING A BROSELEY GAS STOVE
Broseley Fires Ltd, a family run company, was founded as an appliance and design
development company in 1975.
Since then we have built up an enviable reputation for the quality, reliability and
fuel efficiency of our stoves.
These instructions have been carefully prepared to guide the installer and end-user
through the relevant methods and standards for installation of your new Gas Stove.
Correctly installed and operated, your stove will give you many years of warmth
and reliability. Therefore, we would suggest that you read the whole instruction
manual prior to handing it to your installer. That way you will have a clearer picture
of what is involved.
It is required by law that the complete assembly, installation and commissioning of
gas stoves is carried out by a professionally qualified and accredited gas fitter
listed on the
“Gas Safe”
register.
THE INSTALLATION MUST BE IN ACCORDANCE WITH THE ‘GAS SAFETY
INSTALLATION AND USE REGULATIONS’ IN CONJUNCTION WITH THESE
INSTRUCTIONS AND THE RELEVANT ‘BRITISH STANDARDS CODES OF
PRACTICE’ REQUIREMENTS AND THE RELEVANT ‘LOCAL AND NATIONAL
BUILDING REGULATIONS’. A COMMISSIONING CERTIFICATE MUST BE
LEFT WITH THE END CUSTOMER UPON FINAL COMPLETION AND THE
COMMISSIONING FORM COMPLETED IN THE BACK OF THESE
INSTRUCTIONS.
Packing List
Stove Box
Fibre Box
1 x Stove (with burner and mica boards fitted)
1 x Main Base Ceramic
1 x Flue spigot
10 x Loose logs
3 x Spiggot fixings
1 x Instruction manual