
200747_1TB
11
Assembly - Positioning the Logs
Only the ceramics supplied with this appliance should be used. The ceramics
should only be laid as described. Before any ceramics are placed in position
ensure that the pilot is not obstructed and the burner is operating correctly.
Broseley Fires Ltd accepts no responsibility for any injury sustained whilst handling
hot ceramics. Ceramics which are found to be placed other than in accordance
with these instructions will result in a charge being made following any service
callout. Replacement ceramics are available from your dealer.
We recommend lighting the burner for several minutes prior to positioning the
ceramics. Once layout is complete, fire the burner and look for soot deposits. If
soot is evident slight adjustments may need to be made to logs.
1: Place main base ceramic on top of the burner ensuring that it is located centrally
left and right. The circle cut out at the front of the main fuel bed should be central to
the pilot.
Circular Cut-out