14
• Under no circumstances should any part of the tube sag or run uphill.
• Special consideration is required for installation in areas experiencing sub-zero temperature as condensate
could freeze in the drain. In these cases, larger diameter drainage piping is required.
• Approximately 2 to 3 litres per hour of condensate may be produced under continuous running conditions,
depending on the size of the heater.
Note:
It is important that the above guidelines are adhered to as incorrect drainage may cause serious
damage to the heater or its surroundings.
Diagram 14a.
Diagram 14b.
Note:
Always use the correct PVC cement to bond the field supplied PVC pressure pipe to the barbed connector,
following the instructions as detailed for the PVC cement for proper bonding and curing.
324702 CAAB024953 StarPro Installers Heat issue D.indd 17
17/05/16 8:41 AM