background image

4

S19-430EH

Installation

8/22/07

Bradley Corporation • 215-868 Rev. H; ECN 07-526

Installation for Combination Unit

NOTE:  Close water supply lines BEFORE
adding hose assembly.

Step 1: Connect hose and water supply

1. Remove the 3-1/8" pipe connected to the

eyewash valve.

2. Connect one pipe nipple, the pipe tee, and

the other pipe nipple (in that order) between
the eyewash valve and the union as shown in
Figure 2.

• Apply pipe sealant (supplied by installer)

to all pipe joints.

• Use strap wrench around pipes to prevent

pipe marring.

3. Mount the hose clip to the vertical piping

using the hardware provided (see Figure 2).

4. Open the water supply line and check for

leaks and adequate water flow.

Figure 2

Assembly of Components

P.O. Box 

3

09, Menomonee Fall

s

, WI 5

3

051

R

TE

S

T THI

S

 UNIT EACH WEEK

Te

s

t-operate valve(

s

) each week and 

s

i

g

n below.

Report any malfunction

s

 immediately.

Ventil(e) wöchentlich im Te

s

tbetrieb prüfen, be

s

täti

g

durch Unter

s

chrift. Je

g

liche 

S

törun

g

 

s

ofort melden. 

Date
Datum
Date

S

i

g

ned

Unter

s

chrift

S

i

g

ne

Date
Date

Date

S

i

g

ned

S

i

g

ned

S

i

g

ned

DIE

S

E

S

 GERÄT 1

S

T WÖCHENTLICH ZU PRÜFEN.

E

SS

AI HEBDOMADAIRE

Te

s

t le fonctionnement de

s

 valve

s

 chaque 

s

emaine et 

s

i

g

ne en ba

s

S

'il y à quelque cho

s

e qui ne va pa

s

 fait  

un rapport immédiatement. 

5

4.1

4.2

2.2

2.

3

2.4

2.1

1

4

2

3

3

.1

3

.2

3

.

3

3

.1

Parts List

1

S89-002

1

3/8" Yellow Hose

2

S19-787

1

EFW Assembly

2.1

S53-063

1

Dust Cover

2.2

S05-158

1

EFW Sprayhead

2.3

113-544A

1

Nipple (plated)

2.4

S27-265

1

Valve Assembly

3

S45-831

1

Hose Holder Fittings

3.1

269-681

1

U-Bolt with Nuts

3.2

140-601

1

Bracket - Wall

3.3

142-002BS

2

Lockwasher

4

S45-896

1

Hose Hook-Up Prepack

4.1

113-006LG

2

Close Nipple

4.2

269-852

1

Reducing Tee

5

204-421

1

Emergency Inspection Tag

Item

Part No.

Qty

Description

Содержание S19-430EH

Страница 1: ...e Gicleur pour Douche Oculaire Kit de Rociador para Lavaojos Table of Contents Pre Installation Information 2 Installation Instructions 3 4 Assembly of Components 4 Parts List 4 Table des mati re Avan...

Страница 2: ...rify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding...

Страница 3: ...sembly Step 1 Mount hose 1 Connect the pipe nipple and the pipe tee to the eyewash valve as shown in Figure 1 Apply pipe sealant supplied by installer to all pipe joints Use strap wrench around yellow...

Страница 4: ...EACH WEEK Test operate valve s each week and sign below Report any malfunctions immediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St rung sofort melden Date...

Страница 5: ...ates d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereuse...

Страница 6: ...h it non fourni sur tous les filetages Utilisez des tampons autour des tuyaux pour ne pas les endommager lors du serrage 2 Fixer le support boyau au mur avec la vis fournie par l installateur tape 2 B...

Страница 7: ...e 3 8 2 S19 787 1 Assemblage EFW 2 1 S53 063 1 Bouchon antipoussi re 2 2 S05 158 1 Gicleur EFW 2 3 113 544A 1 Mamelon plaque 2 4 S27 265 1 Trousse de robinet 3 S45 831 1 Support boyau pr emball 3 1 26...

Страница 8: ...inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que pu...

Страница 9: ...a manguera 1 Conecte el empalme y la tubo en T a la v lvula Figura 1 Aplicar sellador de tuber a o cinta suministrados por el instalador a las juntas de tuber a Usar una almohadilla de agarre alrededo...

Страница 10: ...3051 R TEST THIS UNIT EACH WEEK Test operate valve s each week and sign below Report any malfunctions immediately Ventil e w chentlich im Testbetrieb pr fen best tigt durch Unterschrift Jegliche St ru...

Отзывы: