Rexroth IndraMotion MLD
Examples
7-19
DOK-IM*MLD-F*STEP**V**-KB01-EN-P
Commissioning and Testing
For commissioning and testing, the following steps have to be carried out:
1. Compile program and then load it to drive
2. Start drive PLC
3. Switch both axes to operating mode (OM). Clear possibly present
errors via "Esc" key
4. Switch power on. Axes must show status "Ab"
5. Establish position data reference for both axes (e.g. set absolute
measuring)
6. Application can be started via input I_1 at CCD master
Visualizing and Diagnosing
The signals can be watched either via
•
the online display,
•
the IndraLogic trace function or
•
the oscilloscope function of the drive.
DB000289v01_en.tif
Fig. 7-30:
IndraLogic trace recording
Содержание REXROTH IndraMotion MLD
Страница 34: ...4 14 Preparation and Assembly Rexroth IndraMotion MLD DOK IM MLD F STEP V KB01 EN P ...
Страница 101: ...Rexroth IndraMotion MLD Index 8 3 DOK IM MLD F STEP V KB01 EN P V W Watching variables with trace recording 6 9 ...
Страница 103: ...9 2 Glossary Rexroth IndraMotion MLD DOK IM MLD F STEP V KB01 EN P ...