10.3 Naming the Material
Insert the programming key, select “MATERIAL SETUP” and select “PREWET 1”, the
screen to the left will appear.
•
Press Enter.
•
Using the Left or Right navigation button move to the letter or number to be
added or changed.
•
Using the Up or Down navigation button, change the letter or number as
required.
•
Once all the letters or numbers have been added or changed press the Enter
button.
10.4 Programming the Material Spread Rates
Insert the programming key, select “MATERIAL SETUP”, and select desired material.
The screen to the left will appear.
Note: The liquid rates are in “ltrs/tonne” or “gallons per tonne”. Select the proper
rates from percentage pre-wetting rate charts.
•
Use the Down navigation button to move the cursor to the desired line to be
changed and press the Enter button.
•
Using the Left or Right navigation button move to the letter or number to be
added or changed.
•
Using the Up or Down navigation button, change the letter or number as
required.
•
Once all the letters or numbers have been added or changed press the Enter
button.
10.5 Nulling of the Pre-wetting Valve Solenoid
10.5.1
10.5.1
10.5.1
10.5.1
Minimum Nulling
Minimum Nulling
Minimum Nulling
Minimum Nulling
Note: Remove the spray nozzels from the spray bar before commencing the nulling
process.
Insert the programming key, select “SENSORS AND VALVES” and select “PREWET
SETUP”. The screen to the left will appear.