28/57
Bosch Rexroth Canada ı 03.10.2011 ı Revision 5.4
Press the Enter button to stop the calibration process. The screen to the left will
appear.
Weigh the material discharged from the vehicle during the calibration process.
Press the Enter button and using the Right/Left navigation arrows move the cursor
under the number to be changed.
•
Using the Up/Down navigational arrow, enter the weight of the material.
•
Once the proper weight has been entered, press the Enter button.
•
Using the Down navigational arrow, move the cursor to “ACCEPT VALUE”
•
Press the Enter button again to confirm acceptance of the weight value, the
screen will return to the starting screen.
NOTE: The “WT/REV” number now reflects the weight per revolution calculated from
the results of the calibration process.
Repeat this process for all materials to be calibrated.
8.4 Verifying Calibration with Simulated Ground Speed
Obtain a material catch container with a known volume and weight capacity. The
higher the capacity, the more accurate it will be. Calculate the time required to fill
the box with a specific rate and vehicle speed.
1.
Place the catch box under the chute.
2.
Set the simulated ground speed to the determined speed:
•
Press Enter then Escape and release both at the same time.
•
Use the up arrow button to increase the speed by 5km/mile increments.
•
Press Escape to see the status screen and monitor the speed.
3.
Pause the unit by pushing the spinner dial.
4.
Set the conveyor rate.
5.
Increase the engine RPM to 1500 to achieve good hydraulic flow.
6.
Un-pause the conveyor and time the discharge.
7.
Pause the conveyor when the time has elapsed.
8.
If the box is low, change the wt/rev value lower. If it has overflowed then
change the value highter.
9.
Repeat the test until the container fills.
10.
Cycle the CS-440 power to stop the speed simulation.