27/57
Bosch Rexroth Canada ı 03.10.2011 ı Revision 5.4
If the gate is in Read
Read
Read
Read B
B
B
Back
ack
ack
ack::::
Physically move the hopper gate and the controller will automatically update the
gate # after the calibration process.
If the gate is in Closed
Closed
Closed
Closed Lo
Lo
Lo
Loop
op
op
op::::
Enter the gate position the calibration is to be performed at, and the gate will move
automatically to that position.
8.3.
8.3.
8.3.
8.3.2
2
2
2 Automatic Calibration
Automatic Calibration
Automatic Calibration
Automatic Calibration
Load the vehicle hopper with the material to be calibrated.
Insert the programming key, select “MATERIAL SETUP” and select desired solid. The
screen to the left will appear.
Use the Down navigation button to move the cursor to “CALIBRATION” and press
the Enter button. The screen to the left will appear.
N
N
N
Note: The screen message is a warning that the system will run during the
ote: The screen message is a warning that the system will run during the
ote: The screen message is a warning that the system will run during the
ote: The screen message is a warning that the system will run during the
calibration process, make sure all personnel is clear of moving parts
calibration process, make sure all personnel is clear of moving parts
calibration process, make sure all personnel is clear of moving parts
calibration process, make sure all personnel is clear of moving parts....
Operate the truck engine at 1500 RPM to ensure good hydraulic oil flow.
Material will be discharging from the vehicle during the calibration process, a means
of collecting this material will be necessary.
Use the Down navigation button to move the cursor to “START” and press the Enter
button. The screen to the left will appear.
Set the Conveyor button to 3. The system will now be running and material is
discharging from the vehicle.
Allow the system to run for several minutes.