6 720 643 256 (2010/05)
98
|
Commissioning log for the heating system
US/CA
12 Commissioning log for the heating system
Home owner/operator:
System installer:
Date commissioned:
FD (Date of manufacture):
Number of heating circuits:
System for DHW heating:
1:
mixed/
unmixed, FB100
: Combi boiler
Mixer time _________________sec set.
: Tank on boiler
2:
mixed/
unmixed, FB100
: tank on low-loss header
Mixer time _________________sec set.
IPM module:
3:
mixed/
unmixed, FB100
ID 3
Mixer time _________________sec set.
ID 4
4:
mixed/
unmixed, FB100
ID 5
Mixer time _________________sec set.
ID 6
ID 7
ID 8
ID 9
ID 10
Solar heating system:
Basic solar heating system: 1
, 2
Solar options: A
, B
, C
, D
, E
The following work has been carried out:
System hydraulics checked; Comments:
Electrical connection checked; Comments:
Automatic configuration completed; Comments:
Heating circuits (IPM) configured; Comments:
Domestic hot water system configured; Comments:
Solar heating system configured and put into service; Comments:
Function check carried out
Customer/system user has been trained how to use the controls
Device documentation handed over
Date and signature of system installer:
Содержание FW 200
Страница 111: ...6 720 643 256 2010 05 Index 111 US CA Notes ...