2
Transport, installation, connection and dismounting
Page 3 / 9
EPA assembly line for DaeP
Assembly Station
VPP 21
Station x
Station 2
Station 3
Station 4
Station 5
Station 6
Station 7
Station 8
Station 9
Station 10
Station 11
Station 12
Station 13
Station 14
Station 15
Station 16
Station 17
Station 18
Station 19
Station 20
Station 21
Station 22
Station 23
Station 24
Station 25
Station 26
Station 27
Station 28
Station 29
Station 30
Station 31
Station 32
Station 33
Station 34
Station 35
Station 36
Station 37
Station 38
Station 39
Station 40
Station 50
Station 60
Station 70
Station 80
Station 90
Station 100
Station 110
Station 120
Station 130
Station 140
Station 150
Station 160
Station 170
Station 180
Station 190
Station 200
Station 210
Station 220
Station 230
Station 240
Station 250
Station 260
Station 270
M.3000314.190_0843.195.960 /
V0.0_0613_EN_PA--ATMO2
Robert Bosch GmbH
Transport
Preparation
d
Properly disconnect the machine from all energy supplies and links to other
machines or devices.
d
Remove all tools from the machine and pack them suitably.
d
Remove all fastening brackets.
d
Secure any moving and non----fastened parts.
d
Close any open ends of lines.
d
Pump off any liquids, if necessary, and dispose of them in a suitable way.
Unloading and transport
CAUTION!
The machines and relevant pack units may be unloaded and transported
only by a specialist company or by trained personnel who have received
safety instruction!
d
The center of gravity must be insured when lifting.
d
Some crates are marked with the symbols for the center of gravity
(ISOR/780 and in DIN 55 402). Transport bases do not have this
designation.
Notice!
The operating instructions are a part of the machine and must be handed
over whenever there is a change of location.