2
Transport, installation, connection and dismounting
Page 7 / 9
EPA assembly line for DaeP
Assembly Station
VPP 21
Station x
Station 2
Station 3
Station 4
Station 5
Station 6
Station 7
Station 8
Station 9
Station 10
Station 11
Station 12
Station 13
Station 14
Station 15
Station 16
Station 17
Station 18
Station 19
Station 20
Station 21
Station 22
Station 23
Station 24
Station 25
Station 26
Station 27
Station 28
Station 29
Station 30
Station 31
Station 32
Station 33
Station 34
Station 35
Station 36
Station 37
Station 38
Station 39
Station 40
Station 50
Station 60
Station 70
Station 80
Station 90
Station 100
Station 110
Station 120
Station 130
Station 140
Station 150
Station 160
Station 170
Station 180
Station 190
Station 200
Station 210
Station 220
Station 230
Station 240
Station 250
Station 260
Station 270
M.3000314.190_0843.195.960 /
V0.0_0613_EN_PA--ATMO2
Robert Bosch GmbH
Installation and connection
Notice!
Floor requirements
For space requirements, weights and load-bearing capacity of floor see
“Chapter 3 Technical data”.
Setting up
It is recommended that the machine/plant should be set up by the
Bosch-Service personnel.
Position the individual stations with the fork-lift truck according to the setting
up plan and align all units exactly to one another in height, angle and
position.
Fix system
Refit all demounted parts and check for correct function. Fix all stations of
the system to the ground using screws and angle brackets.
Connection
The machine must be connected by authorized, skilled personnel. Observe
the locally valid safety regulations and the legal regulations.
Ensure that the available mains voltage and frequency are in accordance
with the values specified on the type plate.