Transport, installation, connection and dismounting
Page 6 / 9
EPA assembly line for DaeP
Assembly Station
VPP 21
Station x
Station 2
Station 3
Station 4
Station 5
Station 6
Station 7
Station 8
Station 9
Station 10
Station 11
Station 12
Station 13
Station 14
Station 15
Station 16
Station 17
Station 18
Station 19
Station 20
Station 21
Station 22
Station 23
Station 24
Station 25
Station 26
Station 27
Station 28
Station 29
Station 30
Station 31
Station 32
Station 33
Station 34
Station 35
Station 36
Station 37
Station 38
Station 39
Station 40
Station 50
Station 60
Station 70
Station 80
Station 90
Station 100
Station 110
Station 120
Station 130
Station 140
Station 150
Station 160
Station 170
Station 180
Station 190
Station 200
Station 210
Station 220
Station 230
Station 240
Station 250
Station 260
Station 270
M.3000314.190_0843.195.960 /
V0.0_0613_EN_PA--ATMO2
Robert Bosch GmbH
Transport
Unloading the machine off the pallet
Run the fork--lift truck under the cross beams of
the base frame and lift up the machine. The
fork--lift truck must have sufficient load--bearing
capacity and a sufficient fork length.
Pos
Measure
1
Unpack the machine and check it for
transport damage.
2
Release the machine fastening from
the wooden pallet. Take the screws
out of the fastening brackets.
3
Lift the machine and drive it away or
remove the wooden pallet.
.
When lifting the machine it must
be ensured that the center of
gravity of the machine is between
the forks of the fork--lift truck
.
If an unstable position of the
machine is noticed during lifting,
set down the machine,
re--approach and relift it with the
fork--lift truck or low--lift platform
truck.
4
Set the machine down uniformly
onto its feet at the envisaged
location.
--
Forks of the fork--lift truck