12/20
Quick Start Guide ACT
91
GB
7.2
Status messages during commissioning (SS…)
The following status messages are possible during Setup:
Status message
Meaning
SS000 OK
Auto set-up routine has been carried out.
SS001 PC Phase 1
The plausibility check (PC) of the motor data is active.
SS002 PC Phase 2
The calculation of dependent parameters is active.
SS004 Parameter
identification
The rated motor values are checked by the parameter
identification feature.
SS010 Setup already
active
The setup routine via the control panel is being
carried out.
SS031 Error – check
P. 259
Error during the auto set-up routine. Check value of
Current Error
259.
SS032 Warning Phase
Asymmetry
The parameter identification feature diagnosed an
unbalance during the measurements in the three
motor phases.
SS099 Setup not
carried out yet.
Self-setup has not yet been carried out.
7.3
Warning and error messages during
commissioning (SA…/SF…)
Warning messages during guided commissioning
Code Meaning / Measure
SA000 No warning message present.
Error messages during guided commissioning
SF000 No Error
For more information about warning and error messages refer to
the applicable operating instructions document.
Содержание ACTIVE ACT2 Series
Страница 1: ...Quick Start Guide 132 kW...
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 13: ...12 20 Quick Start Guide ACT 11 I Grandezza 5 c c1 a a1 a2 x b b1 x x 100 mm...
Страница 15: ...12 20 Quick Start Guide ACT 13 I Grandezza 6 a a1 a2 x x 100 mm b b1 x c c1...
Страница 62: ...60 Quick Start Guide ACT 12 20 GB Size 5 c c1 a a1 a2 x b b1 x x 100 mm...
Страница 64: ...62 Quick Start Guide ACT 12 20 GB Size 6 a a1 a2 x x 100 mm b b1 x c c1...
Страница 112: ...110 Quick Start Guide ACT 12 20 D Baugr e 5 c c1 a a1 a2 x b b1 x x 100 mm...
Страница 114: ...112 Quick Start Guide ACT 12 20 D Baugr e 6 a a1 a2 x x 100 mm b b1 x c c1...
Страница 161: ...12 20 Quick Start Guide ACT 159 F Taille constructive 5 c c1 a a1 a2 x b b1 x x 100 mm...
Страница 163: ...12 20 Quick Start Guide ACT 161 F Taille constructive 6 a a1 a2 x x 100 mm b b1 x c c1...
Страница 212: ...210 Quick Start Guide ACT 12 20 E Tama o 5 c c1 a a1 a2 x b b1 x x 100 mm...
Страница 214: ...212 Quick Start Guide ACT 12 20 E Tama o 6 a a1 a2 x x 100 mm b b1 x c c1...
Страница 255: ......
Страница 256: ......
Страница 257: ......
Страница 258: ...COD VEC 370 R4...