
Trailer Crane AHK 30/1400
Dismantling
02/2008
135
23. Take the cable cut-off (3) out of the
holder (arrow).
24. Carefully unhook the crane hook (1)
from the holder (2).
Fig. 169: Unhook the crane hook
25. Use the "Lower load" function on the
remote control to unreel the carrying
cable, at the same time manually pull
the crane hook (1) in the direction of the
slewing ring. When you have sufficient
cable length stop the unreel process.
26. Hook the hook (1) into the cable loop
(arrow) on the telescoping mast.
27. Raise the telescoping mast until the fly
jib boom can be swung in.
Fig.170 : Hook in the crane hook