INSTALLATION, OPERATION AND MAINTENANCE MANUAL
BiSolid Saver OM-BSSV00/08/2012/EN
11
The higher efficiency compared to competitor boilers is achieved due to the steel made three
pass construction of the heat-exchanger, finishing with two sets of steel tubes (larger heat
exchanging area).
Outer view of hot water boiler from series BiSolid Saver
С
is presented in Figure 5.
Figure 5. Outer view of boiler BiSolid Saver
С
Standard equipment of the boilers from series BiSolid Saver
С
is presented in Figure 6.
Figure 6. Standard equipment of the boilers from series BiSolid Saver
С