11
1. Turn off the machine using the main switch (1) (Fig.1).
2. Rotate the handle so it is vertical.
3. Raise the squeegee off the floor and rotate the knob (2) in the direction of the arrow (Fig.2).
4. Take the machine to the waste water drainage area.
5. Remove the battery (3) from the machine. To free the battery, slide the stop lever (4) in the direction of the arrow (Fig.3).
6. Remove the battery from the machine using the handle molded into it (Fig.4).
7. Rotate the front cover (5) as far as it will go - do this with the aid of the handle (6) (Fig.5).
8. Remove the recovery tank (7) from the machine - do this with the aid of the handle (8) (Fig.6).
9. Remove the recovery tank cover (9), then rotate the handle (8) completely to free the pin (10) from the clamp (11) (Fig.7).
10. Empty the tank.
11. Rinse the inside of the tank with clear water.
12. Position the recovery tank cover (9) on the tank.
13. Fix the cover on the tank, then rotate the handle (8) completely to locking pin (10) on the clamp (11).
14. Remove the solution tank from the device (Fig.8).
15. Remove the detergent solution filling cap (12) from its seat on the solution tank (Fig.9).
16. Empty the tank.
17. Rinse the inside of the tank with clear water.
18. Replace the detergent solution filling cap (12) in its seat on the solution tank (Fig.10)
19. Insert the two tanks in the machine, positioning first the solution tank and then the recovery tank.
20. Rotate the front cover (5) as far as the work position - do this with the aid of the handle (6) (Fig.11).
21. Lock the handle in the horizontal position (Fig.12).
22. Rotate the stop lever of the handle (13) in the direction of the arrow (Fig.13).
23. Collapse the handle by pushing the handle (14) towards the main part of the machine (Fig.14).
24. Rotate the stop lever of the handle (13) in the direction of the arrow (Fig.15).
25. Take the machine to its storage area.
26. Position the machine with its rear part in contact with the floor (Fig.16).
AFTER OPERATION