38477BA2B
2 – 174
25.5.09
2 Installation
Volume 2
2.5.6
Flange Shieldings in the Dip Tube
Increased radiation dose due to open beam path!
A too high dose of radiation may be harmful to your health.
A source may be transported only in its shielding. The shielding
must be closed during transportation and installation.
Special vessel constructions may require installation of the rod
source inside the vessel. Essentially, this does not change the func-
tion and the basic arrangement, as shown in Figure 2-35. Due to
the shorter distance between source and detector and due to the
fact that only one vessel wall has to be irradiated, the required
source activity can be reduced significantly. For this arrangement,
the source is often delivered in a so-called flange shielding which
can be placed onto the flange of the protective tube. If the shield-
ing is installed on the vessel from above, then the source is lowered
into the protective pipe using a steel rope. For installation of the
shielding in a vessel from below or from the side, a shaft core is
used to insert the source into the protective pipe.
Figure 2-34 Flange shieldings for rod source and point source
Содержание Uni-Probe LB 490
Страница 2: ......
Страница 17: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manuals...
Страница 18: ...38477BA2B 1 18 25 5 09 Volume 1...
Страница 22: ...38477BA2B 1 22 25 5 09 1 About this User s Manual Volume1...
Страница 28: ...38477BA2B 1 28 25 5 09 4 Transport and Assembly Volume1...
Страница 44: ...38477BA2B 1 44 25 5 09 6 Radiation Protection Volume1...
Страница 56: ...38477BA2B 1 56 25 5 09 7 Source Replacement Volume1...
Страница 82: ...38477BA2B 1 82 25 5 09 9 Functional Safety Volume1...
Страница 90: ...38477BA2B 1 90 25 5 09 11 Certificates Volume1...
Страница 91: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 91 Volume 1 11 Certificates 1...
Страница 92: ...38477BA2B 1 92 25 5 09 11 Certificates Volume1...
Страница 93: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 93 Volume 1 11 Certificates 1...
Страница 94: ...38477BA2B 1 94 25 5 09 11 Certificates Volume1...
Страница 95: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 95 Volume 1 11 Certificates 1...
Страница 96: ...38477BA2B 1 96 25 5 09 11 Certificates Volume1...
Страница 97: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 97 Volume 1 11 Certificates 1...
Страница 98: ...38477BA2B 1 98 25 5 09 11 Certificates Volume1...
Страница 99: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 99 Volume 1 11 Certificates 1...
Страница 100: ...38477BA2B 1 100 25 5 09 11 Certificates Volume1...
Страница 101: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 101 Volume 1 11 Certificates 1...
Страница 102: ...38477BA2B 1 102 25 5 09 11 Certificates Volume1...
Страница 103: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 103 Volume 1 11 Certificates 1...
Страница 104: ...38477BA2B 1 104 25 5 09 11 Certificates Volume1...
Страница 105: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 105 Volume 1 11 Certificates 1...
Страница 106: ...38477BA2B 1 106 25 5 09 11 Certificates Volume1...
Страница 107: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 107 Volume 1 11 Certificates 1...
Страница 108: ...38477BA2B 1 108 25 5 09 11 Certificates Volume1 11 2 FM Certificate...
Страница 109: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 11 Certificates 1...
Страница 112: ...38477BA2B 1 112 25 5 09 11 Certificates Volume1 11 4 EG Declaration of Conformity...
Страница 115: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 115 Volume 1 1 Notes...
Страница 117: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Uni Probe Installation...
Страница 118: ...38477BA2B 2 118 25 5 09 Volume 2...
Страница 138: ...38477BA2B 2 138 25 5 09 1 System Description Volume2...
Страница 254: ...38477BA2B 2 254 25 5 09 6 Technical Drawings Volume2 6 2 Rod Detector...
Страница 286: ...38477BA2B 2 286 25 5 09 6 Technical Drawings Volume2 6 10 Shielding for Rod Source on Dip Tube...
Страница 288: ...38477BA2B 2 288 25 5 09 6 Technical Drawings Volume2...
Страница 292: ...38477BA2B 2 292 25 5 09 7 Cooling Water Curves Volume2...
Страница 293: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 2 293 Volume 2 2 Notes...
Страница 295: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 HART Communicator User Interface...
Страница 296: ...38477BA2B 3 296 25 5 09 Volume 3...
Страница 340: ...38477BA2B 3 340 25 5 09 3 Getting Started via the HART Communicator Volume3...
Страница 403: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 3 403 Volume 3 3 Notes...
Страница 405: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 4 PACTware User Interface FDT DTM...
Страница 406: ...38477BA2B 4 406 25 5 09 Volume 4...
Страница 408: ...38477BA2B 4 408 25 5 09 1 PC Connection to the Uni Probe Volume4...
Страница 416: ...38477BA2B 4 416 25 5 09 2 Installing and Working with DTM Volume4...
Страница 417: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 4 417 Volume 4 4 Notes...
Страница 419: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 5 SIMATIC PDM User Interface HART...
Страница 422: ...38477BA2B 5 422 25 5 09 1 Hardware Configuration Volume5...
Страница 490: ...38477BA2B 5 490 25 5 09 4 Menu Overview Volume5...
Страница 512: ...38477BA2B 5 512 25 5 09 5 Calibration with SIMATIC PDM Volume5...
Страница 526: ...38477BA2B 5 526 25 5 09 7 Working with SIMATIC PDM Volume5...
Страница 542: ...38477BA2B 5 542 25 5 09 8 Explanations Volume5...
Страница 550: ...38477BA2B 5 550 25 5 09 9 Error Handling Volume5...
Страница 551: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 5 551 Volume 5 5 Notes...
Страница 553: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 6 SIMATIC PDM User Interface Profibus PA...
Страница 600: ...38477BA2B 6 600 25 5 09 3 Device specific Menus Volume6...
Страница 624: ...38477BA2B 6 624 25 5 09 4 Calibration with SIMATIC PDM Volume6...
Страница 648: ...38477BA2B 6 648 25 5 09 6 Explanations Volume6...
Страница 654: ...38477BA2B 6 654 25 5 09 7 Error Handling Volume6...
Страница 655: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 6 655 Volume 6 6 Notes...
Страница 657: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 7 FOUNDATION Fieldbus User Interface...
Страница 664: ...38477BA2B 7 664 25 5 09 2 Installation Program Start Volume7...
Страница 672: ...38477BA2B 7 672 25 5 09 3 Parameter Overview Volume7...
Страница 688: ...38477BA2B 7 688 25 5 09 4 Calibration with FOUNDATION Fieldbus Volume7...
Страница 700: ...38477BA2B 7 700 25 5 09 5 Functional Processes Volume7...
Страница 720: ...38477BA2B 7 720 25 5 09 7 Error Handling Volume7...
Страница 721: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 7 721 Volume 7 7 Notes...
Страница 728: ...Index Volume 1 7 38477BA2B I 728 25 5 09...
Страница 729: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 729 Volume 1 7 Notes...