Uni-Probe LB 490
BERTHOLD TECHNOLOGIES GmbH & Co. KG
2 – 171
Volume 2
2 Installation
2
Figure 2-31 Shielding closed, view from operator's side; the opposite side
is facing the vessel or the detector
IMPORTANT
Following installation of the shielding, the function of the locking
mechanism has to be tested periodically, depending on the operat-
ing conditions. The function check has to be carried out every six
months and recorded.
Open shielding
After the shielding has been installed, it may be opened only for
commissioning. Open the transportation safety device and open
the lock. Now use the lever fixed to the base by adhesive tapes and
insert it into the borehole for the locking mechanism. Open the
beam path by turning the lever right all the way to the right limit
stop.
This position can now be locked again with the padlock to prevent
inadvertent closing of the beam path during operation. If locking
with the lock should not be permitted, you may also fix the position
with the supplied screw.
Pneumatic actuator
As an option, rod source shieldings may be supplied with a pneu-
matic actuator. You find the technical data in section
Top marking
Marking for installation direction bottom
Transportation safety device
Do not remove the transportation safety
device before completing the installation
Lever for opening the source shielding
During transportation, the lever is fixed to
the shielding by adhesive tape. With the
lever, the shielding can be turned to the
OPEN or CLOSED position
.
Source type label with information
on source and dose rate, see
Figure 6-1 on page 1–40
Borehole for lever
Padlock
The padlock must remain locked until the
measuring system is taken into operation
Commission number
Eyebolts
Safety screw to fix the shielding in
the open position when locking by
the lock is not permitted
Type label of the shielding
with model name and serial
number
Direction of rotation for opening
Содержание Uni-Probe LB 490
Страница 2: ......
Страница 17: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 1 Safety Manuals...
Страница 18: ...38477BA2B 1 18 25 5 09 Volume 1...
Страница 22: ...38477BA2B 1 22 25 5 09 1 About this User s Manual Volume1...
Страница 28: ...38477BA2B 1 28 25 5 09 4 Transport and Assembly Volume1...
Страница 44: ...38477BA2B 1 44 25 5 09 6 Radiation Protection Volume1...
Страница 56: ...38477BA2B 1 56 25 5 09 7 Source Replacement Volume1...
Страница 82: ...38477BA2B 1 82 25 5 09 9 Functional Safety Volume1...
Страница 90: ...38477BA2B 1 90 25 5 09 11 Certificates Volume1...
Страница 91: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 91 Volume 1 11 Certificates 1...
Страница 92: ...38477BA2B 1 92 25 5 09 11 Certificates Volume1...
Страница 93: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 93 Volume 1 11 Certificates 1...
Страница 94: ...38477BA2B 1 94 25 5 09 11 Certificates Volume1...
Страница 95: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 95 Volume 1 11 Certificates 1...
Страница 96: ...38477BA2B 1 96 25 5 09 11 Certificates Volume1...
Страница 97: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 97 Volume 1 11 Certificates 1...
Страница 98: ...38477BA2B 1 98 25 5 09 11 Certificates Volume1...
Страница 99: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 99 Volume 1 11 Certificates 1...
Страница 100: ...38477BA2B 1 100 25 5 09 11 Certificates Volume1...
Страница 101: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 101 Volume 1 11 Certificates 1...
Страница 102: ...38477BA2B 1 102 25 5 09 11 Certificates Volume1...
Страница 103: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 103 Volume 1 11 Certificates 1...
Страница 104: ...38477BA2B 1 104 25 5 09 11 Certificates Volume1...
Страница 105: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 105 Volume 1 11 Certificates 1...
Страница 106: ...38477BA2B 1 106 25 5 09 11 Certificates Volume1...
Страница 107: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 107 Volume 1 11 Certificates 1...
Страница 108: ...38477BA2B 1 108 25 5 09 11 Certificates Volume1 11 2 FM Certificate...
Страница 109: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 109 Volume 1 11 Certificates 1...
Страница 112: ...38477BA2B 1 112 25 5 09 11 Certificates Volume1 11 4 EG Declaration of Conformity...
Страница 115: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 1 115 Volume 1 1 Notes...
Страница 117: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 2 Uni Probe Installation...
Страница 118: ...38477BA2B 2 118 25 5 09 Volume 2...
Страница 138: ...38477BA2B 2 138 25 5 09 1 System Description Volume2...
Страница 254: ...38477BA2B 2 254 25 5 09 6 Technical Drawings Volume2 6 2 Rod Detector...
Страница 286: ...38477BA2B 2 286 25 5 09 6 Technical Drawings Volume2 6 10 Shielding for Rod Source on Dip Tube...
Страница 288: ...38477BA2B 2 288 25 5 09 6 Technical Drawings Volume2...
Страница 292: ...38477BA2B 2 292 25 5 09 7 Cooling Water Curves Volume2...
Страница 293: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 2 293 Volume 2 2 Notes...
Страница 295: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 3 HART Communicator User Interface...
Страница 296: ...38477BA2B 3 296 25 5 09 Volume 3...
Страница 340: ...38477BA2B 3 340 25 5 09 3 Getting Started via the HART Communicator Volume3...
Страница 403: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 3 403 Volume 3 3 Notes...
Страница 405: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 4 PACTware User Interface FDT DTM...
Страница 406: ...38477BA2B 4 406 25 5 09 Volume 4...
Страница 408: ...38477BA2B 4 408 25 5 09 1 PC Connection to the Uni Probe Volume4...
Страница 416: ...38477BA2B 4 416 25 5 09 2 Installing and Working with DTM Volume4...
Страница 417: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 4 417 Volume 4 4 Notes...
Страница 419: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 5 SIMATIC PDM User Interface HART...
Страница 422: ...38477BA2B 5 422 25 5 09 1 Hardware Configuration Volume5...
Страница 490: ...38477BA2B 5 490 25 5 09 4 Menu Overview Volume5...
Страница 512: ...38477BA2B 5 512 25 5 09 5 Calibration with SIMATIC PDM Volume5...
Страница 526: ...38477BA2B 5 526 25 5 09 7 Working with SIMATIC PDM Volume5...
Страница 542: ...38477BA2B 5 542 25 5 09 8 Explanations Volume5...
Страница 550: ...38477BA2B 5 550 25 5 09 9 Error Handling Volume5...
Страница 551: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 5 551 Volume 5 5 Notes...
Страница 553: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 6 SIMATIC PDM User Interface Profibus PA...
Страница 600: ...38477BA2B 6 600 25 5 09 3 Device specific Menus Volume6...
Страница 624: ...38477BA2B 6 624 25 5 09 4 Calibration with SIMATIC PDM Volume6...
Страница 648: ...38477BA2B 6 648 25 5 09 6 Explanations Volume6...
Страница 654: ...38477BA2B 6 654 25 5 09 7 Error Handling Volume6...
Страница 655: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 6 655 Volume 6 6 Notes...
Страница 657: ...1 g l Time 0 00 10 30 11 00 11 3012 00 12 30 Volume 7 FOUNDATION Fieldbus User Interface...
Страница 664: ...38477BA2B 7 664 25 5 09 2 Installation Program Start Volume7...
Страница 672: ...38477BA2B 7 672 25 5 09 3 Parameter Overview Volume7...
Страница 688: ...38477BA2B 7 688 25 5 09 4 Calibration with FOUNDATION Fieldbus Volume7...
Страница 700: ...38477BA2B 7 700 25 5 09 5 Functional Processes Volume7...
Страница 720: ...38477BA2B 7 720 25 5 09 7 Error Handling Volume7...
Страница 721: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 7 721 Volume 7 7 Notes...
Страница 728: ...Index Volume 1 7 38477BA2B I 728 25 5 09...
Страница 729: ...Uni Probe LB 490 BERTHOLD TECHNOLOGIES GmbH Co KG 729 Volume 1 7 Notes...