
A note on the Hardware in your kit. MOST of the hardware is located in the long
strip of plastic, and marked with a sticky label. SHCS stands for Socket Head
Cap Screw; FHCS stands for Flat Head Cap Screw, which is the same as a
countersunk screw.
Lets get started.
Assemble the landing gear, which will require some heat to get the plastic struts
onto the aluminum skids. Actually it may take a LOT of heat.
☺
☺
☺
☺
One suggestion
is to boil the struts to heat them up. Use Gloves of course.. We offer different
colors, so yours may vary from the pictures.
Tap the plastic ends into the skids with a soft mallet. From Bag 2 take the skid
bars and use them as a template for drilling 3 ea 1/8
th
inch holes.
Содержание INTREPID GAS
Страница 1: ...INTREPID GAS and GAS EB INTREPID GAS and GAS EB INTREPID GAS and GAS EB INTREPID GAS and GAS EB...
Страница 3: ...INTREPID GAS Table Of Contents...
Страница 29: ...Your Intrepid Gas kit starts off something like this And ends up something like this...
Страница 52: ...The lower frame set is now ready to accept the upper frames but we have to put them together first Bag 5...