
Using a #46 drill bit, in one of the other 2 holes, drill THROUGH the arrow shaft
and INTO the dogbone, leaving a divot. Disassemble the joint and inspect your
divot. You want it deep enough that the setscrew will sit into it when
assembled.
Reassemble and install a 3X3 setscrew with loctite in the hole with the divot,
seating the setscrew in the divot. Loctite and install the other 2 setscrews into
the remaining holes.
Содержание INTREPID GAS
Страница 1: ...INTREPID GAS and GAS EB INTREPID GAS and GAS EB INTREPID GAS and GAS EB INTREPID GAS and GAS EB...
Страница 3: ...INTREPID GAS Table Of Contents...
Страница 29: ...Your Intrepid Gas kit starts off something like this And ends up something like this...
Страница 52: ...The lower frame set is now ready to accept the upper frames but we have to put them together first Bag 5...