Beretta Exclusive GREEN HE C.S.I. 35 kW Скачать руководство пользователя страница 20

EXCLUSIVE GREEN HE C.S.I. - R.S.I.

 

26

 

 

 

2

 

2

 

2

 

MINIMUM VENTILATOR SPEED (P. LP)

 

-  Select parameter LP

 

-  Press the ENTER button, then modify the value of the parameter by turning 

the sanitary water temperature selector. The minimum speed of the fan is 
linked with the type of gas and the power of the boiler, 

table 2

 

-  Turn the sanitary water temperature selector in order to adjust the set value

 

-  Confirm the new value you have set by pressing ENTER.

 

The value indicated on the display is expressed in revs min/100  (example

 

36oo = 36).

 

The value set during this operation automatically modifies the maximum 
value of parameter 24.

 

VENTILATOR IGNITION SPEED (P. SP)

 

-  Select parameter SP

 

-  Press the ENTER button, then modify the value of the parameter by turning 

the sanitary water temperature selector. The standard slow start value is 
3700 revs/min (25HE) - 3300 revs/min (35HE)

 

-  Confirm the new value you have set by pressing ENTER.

 

MAXIMUM POWER ADJUSTMENT (P. HH) (Fig. 1.17)

 

-  4URN THE BOILER /&&

 

-   Select the parameter HH and wait for the boiler to come on

 

Table 1

 

MAXIMUM NUMBER OF FAN REVOLUTIONS

 

 

 

G20

 

G31

 

 

25 C.S.I.-R.S.I.

 

60

 

60

 

rpm

 

35 C.S.I.-R.S.I.

 

60

 

59

 

rpm

 

 

Table 2

 

MINIMUM NUMBER OF FAN REVOLUTIONS

 

 

 

G20

 

G31

 

 

25 C.S.I.-R.S.I.

 

12

 

19

 

rpm

 

35 C.S.I.-R.S.I.

 

12

 

19

 

rpm

 

 

Table 3

 

 

 

G20

 

G31

 

 

25 #.3.).-2.3.). - #/

max

 

9,0

 

10,0

 

%

 

35 #.3.).-2.3.). - #/

max

 

9,0

 

10,0

 

%

 

Table 4

 

- #HECK THAT THE MAXIMUM #/ reading on the analyser (see paragraph

 

“Checking combustion parameters”) corresponds with the values indicated 
in 

table 3

.

 

)F THE #/

proves to comply with the values in the table, proceed to adjust the 

next parameter (LL - adjusting the minimum), if different modify the value by 
turning the maximum power adjustment screw with a screwdriver (clockwise 
to decrease) until you obtain a value contained in 

table 3

.

 

MINIMUM POWER ADJUSTMENT (P. LL) (Fig. 1.17)

 

-  3ELECT THE PARAMETER ,, (WITH THE BOILER STILL /&&) AND WAIT FOR THE BOILER

 

to come on.

 

&OR 

25 HE 

only: unscrew the screws fastening the silencer (A) and remove 

it (

Fig. 1.18

)

 

- Disconnect the mixer gas ramp. Unscrew the clamp screws and relative 

mixer springs to fan and then remove it.

 

- &OR 

HE 35 

only: unscrew the screws fixing the plastic Venturi to the alu- 

minium shell

 

-  Loosen the plastic Venturi (B) - 

Fig. 1.18 

- by levering from under the teeth

 

("% #!2%&5, ./4 4/ &/2#% 4(%-) AND PRESS FROM THE OPPOSITE SIDE

 

until it is completely extracted from the aluminium shell.

 

-  Using wrench CH6 remove and 

DISGARD AND DO NOT RE-USE 

the 2

 

- #HECK THAT THE MINIMUM #/

 

reading on the analyser (see   paragraph

 

nozzles (C), clean plastic debris from relative housing (

Fig. 1.20

)

 

“Checking combustion parameters”) corresponds with the values indicated

 

in 

table 4

.

 

-  Press in the 2 new nozzles from the kit as far as the threaded part, then 

screw in tightly

 

)F THE #/

 

proves to be different from the values in the table, proceed to

 

-  Reassemble the mixer with the flap in a horizontal position and the spacer

 

adjust the parameter by turning the maximum power adjustment screw after

 

having unscrewed the protective cap (clockwise to increase) until you obtain 
a value contained in 

table 4.

 

IGNITION SPEED (P. MM)

 

-  Select parameter MM.

 

The boiler starts at the slow ignition speed.

 

-  Turn the heating water selector to increase or decrease the fan speed.

 

MINIMUM HEATING ADJUSTMENT POSSIBILITY (P. 24)

 

-  Select parameter 24

 

-  Press the ENTER button to access the parameter value modification 

function

 

-  Turn the sanitary water selector to modify the minimum fan speed

 

-  Confirm the value you have set by pressing ENTER.

 

%XIT THE #!,)"2!4)/. & 3%26)#% FUNCTION BY PRESSING %3#!0%. 
4HE BOILER RETURNS TO THE h- -v (/&&) STATUS.

 

To reset, press the     button.

 

-  Disconnect the pressure gauge and tighten the pressure tap screw.

 

 

RANGE RATED MAXIMUM OUTPUT CH (FAN SPEED) - 23

 

Select the parameter 23 by turning the encoder. Push ENTER button and 
modify  the  maximum  fan  speed  as  indicated  in  the  range  rated  table  by 
turning the encoder. Push ENTER button to store the alue. The values just 
setted must be recorded on the last page of this manual.

 

 

After adjusting the gas valve, seal it with sealing wax. 

After making adjustments:

 

-  return    the    temperature    set    with    the    ambient    thermostat    to    the 

required

 

position

 

-  close the panel

 

-  put back the shell.

 

 

19 - GAS CONVERSION

 

It is easy to transform gas from one family to gas belonging to another family 
even with the boiler installed.

 

This job must be done by professionally qualified personnel only.

 

4HE BOILER IS SUPPLIED TO RUN ON NATURAL GAS ('2o) n SEE THE PRODUCT RATING

 

plate for details.

 

The boiler can be transformed to use propane gas using a special kit.

 

 

&OLLOW THE INSTRUCTIONS GIVEN HERE BELOW FOR     DISASSEMBLY:

 

-  Switch off the power to the boiler and turn off the gas cock

 

-  Remove the panel  and  casing

 

-  Lift up and rotate the instrument panel

 

- /PEN THE AIR BOX COVER

 

SPRINGS PLACED AT 12o

— AS SHOWN IN THE 

(Fig. 1.20)

 

-  Reassemble gas ramp and silencer, working vice versa.

 

-  Check the number of times the fan turns

 

-  Switch on the power to the boiler and turn on gas cock again

 

- &ILL IN AND STICK ON THE ACCOMPANYING TRANSFORMATION DATA LABEL

 

-  Close the air box cover

 

-  Close up the instrument panel again

 

-  Reassemble the casing and panel

 

 

Programme the “Gas type” parameter and regulate the boiler following the 
instructions in the “Adjustments” section.

 

 

Transformation must be done by qualified personnel only.

 

After  completing  transformation,  regulate  the  boiler  again  following 
instructions given in the specific paragraph and apply the new identi- 
fication label from the kit.

 

 

General maintenance

 

Be particularly careful when handling the mixer: the Clapet juts out from the 
body so that the mixer must be laid on the air inlet side (flap area) or make 
sure the Clapet is inside the body if it has to be laid on the Clapet side.

 

The Clapet must never have to bear the weight of the mixer.

 

Clean the Venturi from any dust with an aspirator during the annual system 
cleaning. Check that flap and Clapet  are working correctly (all open at rated 
flow, all closed at minimum flow)

 

 

20

– CHECKING COMBUSTION PARAMETER

 

Do as follows to analyze combustion:

 

- GO TO '!5').' & 3%26)#% AND SET THE COMBUSTION ANALYSIS PASSWORD

 

as given in paragraph “Adjustments”

 

- insert the analyzer probe into the specific openings on the air box, after 

removing screw B and cap C.

 

The fumes analysis probe must be introduced as far as possible

 

- screw the analyzer setscrews into the fumes analysis opening

 

- the first display gives the reading of the number of turns corresponding to 

maximum heating power set on the boiler (see paragraph “Adjustments” 
item P23)

 

After turning the domestic hot water temperature selector again the boiler 
will ignite to check combustion

 

- check combustion

 

refer to the “Adjustments” paragraph if the boiler has to be gauged

 

- remove the analyzer gauge and close the combustion analysis openings 

by their screws.

 

 

IMPORTANT

 

The function switching off the boiler when the water temperature   reaches

 

MAXIMUM LIMIT OF ABOUT 9o

—# WILL ALSO STAY ON DURING COMBUSTION   ANALYSIS

 

 

G20

 

G31

 

 

25 #.3.).-2.3.). - #/

min

 

9,5

 

10,0

 

%

 

35 #.3.).-2.3.). - #/

min

 

9,5

 

10,0

 

%

 

 

19 

 

Содержание Exclusive GREEN HE C.S.I. 35 kW

Страница 1: ...DEL INSTALADOR Y DEL USUARIO PT MANUAL DO USUARIO E DO INSTALADOR HU TELEPiTOI ES FELHASZNAL6I KEZIKONYV RO MANUAL DE INSTALARE SI UTILIZARE SI NAVODILA ZA VGRADITEV PRIKLJUCITEV IN UPORABO PL INSTRUK...

Страница 2: ...2004 108 EEC Niskonapi ciowe wyroby elektryczne 2006 95 EEC Norma dotyczqca kotU6w kondensacyjnych 677 l w CE lnstrukcja instalacji i uzytkowania 148 Budowa kotUa 172 Obieg hydrauliczny 173 174 Schema...

Страница 3: ...trical devices or equipment such as switches appliances etc should not be used if there is a smell of gas or fumes If there is a gas leak open all the doors and windows to ventilate the area turn off...

Страница 4: ...DE P90 1 In this mode the modulating circulation unit works constantly at maximum speed It is used on plants with a high load loss in which the boiler s head must be used as much as possible in order...

Страница 5: ...articles After installation make sure that all the joints have been made airtight conforming to standard installation practices 7 ELECTRIC CONNECTION To access the electrical connections proceed as fo...

Страница 6: ...conditions C53 7ALL OR ROOF SEPARATE EXHAUSTION AND SUCTION IN DIFFERENT PRESSURE AREAS Exhaustion and suction must never be located on opposite walls C63 Exhaustionandsuctionwithseparatelycertifieda...

Страница 7: ...ic power 7 88 116 88 116 Category II2H3P II2H3P II2H3P II2H3P Supply voltage V Hz 230 50 230 50 230 50 230 50 Protection level IP X5D X5D X5D X5D Chimney losses with burner off on 0 10 2 16 0 08 2 30...

Страница 8: ...n revolutions at slow start revs min 3 700 3 700 Maximum number of fan revolutions revs min 6 000 6 000 Minimum number of fan revolutions revs min 1 200 1 900 EXCLUSIVE GREEN C S I 35 kW Diaphragm num...

Страница 9: ...le 4HE DISPLAY WILL LOOK LIKE IG 2 If the test is unsuccessful the boiler will not work and a 0 will flash on the display In this case contact the Technical Assistance Centre The boiler turns on in th...

Страница 10: ...tion has been made the modification is memorised and the display returns to the delivery temperature read by the probe Working the boiler Adjust the ambient thermostat to the required temperature appr...

Страница 11: ......

Страница 12: ...work at minimum power to increase the water temperature to a safe value 35 The symbol lights up on the display circulator anti block one operating cycle is performed every 24hours Switching off for lo...

Страница 13: ...INUTES THEWORDINGh3 vWILLAPPEARONTHEDISPLAY IG 16 AND THE hFUNCTION SELECTION INDICATORSv will light up in sequence Press button to stop the automatic vent cycle If you have to fill the system several...

Страница 14: ...nfo 5 displays the set heating temperature in reference to the second circuit only if it is connected S A R A function Fig 21 If the winter mode is selected the S A R A Automatic Ambient Adjustment Sy...

Страница 15: ...water gauge If the pressure is insufficient 0 4 bar red area proceed with the filling OPERATIONS DESCRIBED IN THE CHAPTER h ILLING AND EMPTYING THE SYSTEMSv F THE SYSTEM S PRESSURE IS SUFlCIENT o 6 B...

Страница 16: ...perations the select functions button acts as an ENTER confirm button the button acts as an ESCAPE escape button If no confirmation is given within 10 seconds the value is discarded and returns to the...

Страница 17: ...5 30 4 4 2 2 3 4 5 4 o 1 YES 0 31 8 5 4 3 4 0 4 2 CIRCUIT 40 80 45 32 5 4 3 4 0 4 2 CIRCUIT 20 39 25 40 7 4 2 34 4 0 2 4 o 1 54 2 1 41 4 3 0 2 4 2 3 4 53 4 3 4 9 1 42 3 2 5 4 o 1 54 1 43 4 3 0 2 4 2 3...

Страница 18: ...M DELIVERY TEMPERATURE 5 4 3 4 0 4 PARAMETER 44 Enable thermoregulation function The connected external temperature probe combined with PARAMETER 44 provides the following operating modes 84 2 02 4 AN...

Страница 19: ...n phases 4URN THE DOMESTIC HOT WATER SELECTOR TO SEQUENTIALLY SCROLL THE 2 4 3 26 PHASES 1 gas type don t modify this parameter 2 boiler power minor parameter 3 insulation level of building only if ex...

Страница 20: ...rm the value you have set by pressing ENTER XITTHE 2 4 3 26 FUNCTIONBYPRESSING 3 0 4HEBOILERRETURNSTOTHEh v STATUS To reset press the button Disconnect the pressure gauge and tighten the pressure tap...

Страница 21: ...sure the main heat exchanger is clean and free of any residuals or obstruction Check and clean where necessary the condensation trap to make sure it works properly lMPORTANT always switch off the pow...

Страница 22: ...e emissions Qnrisc 35 HE 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 HEATING HEAT CAPACITY K7 Heat capacity curve fan rpm Qnrisc 35 HE 6500 6000 5500 5000 4500 4000 3500 3000 2500 2000 1500 1000...

Страница 23: ...are SI SESTAVNI DELI KOTLA 1 Filling tap C S I 2 Pressuretransducer 3 Discharge valve 4 Three way solenoid valve 5 Safety valve 6 Circulation pump 7 Lower air vent valve 8 Hydrometer 9 Siphon 10 Retur...

Страница 24: ...bi boilers HE C S I EN MULTI WIREDIAGRAM ES ESQUEMA DE CONEXIONES 04 2 4 0 HU T BBVEZET KES RAJZ RO SCHEMA ELECTRICA MULTIFILARA SI ELEKTRI NA SHEMA PL SCHEMAT ELEKTRYCZNY COMBI BOILERS CSI With on de...

Страница 25: ...xternal connections inlow voltage M2 Terminal board supplementary pump connection M3 M6 Terminal board for external connections inhigh voltage M4 Terminal board water tank sensor connection R S I OPE...

Страница 26: ...he connections forthe low voltage functions to the 10 pole low voltage connections terminal board M10 as indicated in the diagram Fit the P O S DHW time clock as shown in the diagram after removing th...

Страница 27: ......

Страница 28: ...m ben RO dimensiuni in mm SI mere v mm PL wymiary w mm C B MB EN A condensate outlet C water gas ES A salida condensado C gas agua PT A sa da condensada C gua g s HU A kondenzvfz elvezetesIC vfz gaz R...

Страница 29: ...EXCLUSIVE GREEN HE C S I R S I 183 F R S I 1 9 C S I R S I C C A A D B F E D F 1 6 1 8 C S I E 1 7 A G F E 27...

Страница 30: ...R POWIETRZA DO SPALANIA Z POMIESZCZENIA 1 14 EN CONCENTRIC DUCT FOR FUMES OUTLET AIR INTAKE ES CONDUCTO CONC NTRICO PARA SALIDA DE HUMOS ENTRADA DE AIRE PT DUTO CONC NTRICO PARA SA DA DE FUMA A ENTRA...

Страница 31: ...T W SPALANIA M B D UGO PRZEWODU ZASYSANIA POWIETRZA m M F EXCLUSIVE GREEN 35 HE M M M F EN M spring F horizontal flap ES Muelle M F aleta horizontal PT mola M aba horizontal F HU M rug6 F vfzszintes z...

Страница 32: ...Registration of this product is required under the terms of warranty Please ensure you complete and return the commissioning declaration registration with this boiler to activate your warranty SERVIC...

Отзывы: