5.2 Initial Programming
At start up the control displays an initial screen
showing the firmware version.
Pressing
“ok”
a guided procedure is started for configuring
the system; select the desired options with the
“up”
and
“down”
keys, confirming the selections made:
When this screen is presented select FROM AKM and
confirm OK
Set the TIME and DATE confirming each parameter by
pressing ok to confirm
b
1
a
5
COMMISSIONING
5.1 Preliminary checks
First ignition must be performed by a qualified
competent engineer.
Before starting the boiler, check:
- That supply networks (electricity, water, gas) correspond
to the data
- That the flue pipes and air suction pipes are installed correctly
- that spacing conditions for regular maintenance are
guaranteed if the boiler is placed inside or between items
of furniture
- The Gas system is sound
- That the fuel flow rate corresponds to values required by the
boiler
- That the fuel supply system is sized to provide the correct
low rate to the boiler, and that it has all the safety and
control devices required
-
That the circulator rotates freely because, occasionally
from new or after a long period of dormancy the impeller
can stick.
See below
Releasing of the circulating pump shaft
- Insert a screwdriver in hole (
1
) of the circulator.
- Press (
a
) and turn with Phillips screwdriver (
b
) to release
the pump shaft
Perform this operation with caution to avoid damaging components.
SLAVE
MASTER
Select MASTER from the next screen and ok to confirm