Assembly & initial set-up
5
B.
Cut out and secure the drilling template (item1)
with adhesive tape on the left side of the chute
using the marks shown (6" from the base).
Mark the holes to be drilled with a center punch
and hammer. Drill holes A (Ø 11/32") and B (Ø
9/32").
Note:
Drill hole A (Ø 11/32") only if there is no hole
there.
C.
Assemble the lever (item 1) and the arm (item 2)
using a hex bolt. 1/4" n.c. x 3/4" (item 3) and a
nylon insert lock nut (item 4).
DO NOT TIGHTEN COMPLETELY so that the arm
moves freely.
D.
Insert three hex bolts. 1/4"n.c. x 2" (item 1) in the
Ø9 / 32" holes in the chute. Insert the three 5/16"
flat washers (item 2) on the three bolts.
Insert the two spacers (item 3) on the two rear
bolts. Insert the oil lite bushing (item 4) on the
front bolt.
Put on the assembled lever (item A) on the oil lite
bushing (item 4).
E.
Insert the 5/16" flat washers (item 1) and the
bracket (item 2) on the bolts.
Insert the electric motor (item 3) on the bolts.
Secure everything in place using three 1/4"nylon
insert lock nuts (item 4).
Содержание BERCO 701036
Страница 13: ...Parts breakdown 11 Part list and parts breakdown...
Страница 14: ...Parts breakdown 12...