20
Bentone
5.3 Pressure switch for min. oil
pressure
The burner control unit has a connection for a pressure switch for min. oil
pressure. If the facility regulations do not require this switch, a jumper should
be fitted between terminals 12 and 13 of the terminal block to close the
circuit and enable the burner to be started.
5.4 Pressure switch for max. oil
pressure
The burner control unit has a connection for a pressure switch for max. oil
pressure. If the facility regulations do not require this switch, a jumper should
be fitted between terminals 2 and 3 of terminal block X5-02 in the automatic
control unit to close the circuit and enable the burner to be started.
5.5 Calculate prepurge time,
Industrial applications
Prepurge time can be set on control unit LMV with parameter 265.
Formula symbol
Description
Example values
V
Volume fire box [m
3
]
4.18 m
3
Q
Burner output [kW]
418 kW
T
Prepurge time [s]
Industrial applications according to EN 746.
The prepurge time must correspond to at least 5 complete
air circulations in the fire box and adapted compartments.
T
=
V · 5
T
=
4.18 m
3
· 5
=
150 s
Q · 1.2 /
3600
418 kW · 1.2 /
3600
Calculate prepurge time using the following formula:
Содержание B 45i A2.2H J/K
Страница 12: ...12 Bentone 11 12 13 14 15 3 16 18 19 20 21 22 23 25 24 17...
Страница 35: ...35 Bentone 8 2 Wiring diagram A DC Bl Svart LMO QRB 12 11 Blue Blau Bleue Black Schwarz Noir A1...
Страница 106: ......
Страница 107: ......
Страница 108: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com...