10AP Series Two-Post Lifts
34
P/N 5900265 — Rev. A6 — December 2022
Effective Embedment
is the
location in the Hole where the
Expansion Sleeve presses into the
Concrete. This is where the Anchor
Bolts get their holding strength, the
further down into the Hole, the greater
the holding strength.
Nominal Embedment
is how far
down into the Hole the bottom of the
Anchor Bolt is, which does not tell you
anything about the holding strength.
To install the Posts
:
Using a Forklift or Shop Crane, move the Posts to the Chalk Line Guides you created earlier.
Carefully stand up each Post,
one at a time
, and move them to the appropriate location.
Double check your measurements against the
for your Lift model.
Using the Base Plates as guides, drill each hole
4 inches
deep using a carbide bit.
Go in straight; do not let the drill wobble.
The diameter of the drill bit must be the same as the diameter of
the Anchor Bolt. If you are using a ¾ inch diameter Anchor Bolt, for
example, use a ¾ inch diameter drill bit.
Do not drill all the way through the Concrete
; if you
punch completely through the slab, you could compromise the
holding strength of the Anchor Bolts.
Vacuum each hole clean.
⚠
WARNING
You
must
use the appropriate safety gear including safety glasses, dust masks,
gloves, steel-toed work boots and heavy work clothes when anchoring the Posts.
BendPak recommends using a vacuum to get the hole very
clean.
You can also use a wire brush, hand pump, or compressed air;
just
make sure to thoroughly clean each hole
.
Do
not
ream the hole. Do
not
make the hole any wider than
the drill bit made it.
Содержание Clearfloor 10AP
Страница 75: ...10AP Series Two Post Lifts 75 P N 5900265 Rev A6 December 2022 Labels ...
Страница 76: ...10AP Series Two Post Lifts 76 P N 5900265 Rev A6 December 2022 ...
Страница 77: ...10AP Series Two Post Lifts 77 P N 5900265 Rev A6 December 2022 ...
Страница 78: ...10AP Series Two Post Lifts 78 P N 5900265 Rev A6 December 2022 Parts Drawings ...
Страница 79: ...10AP Series Two Post Lifts 79 P N 5900265 Rev A6 December 2022 ...
Страница 80: ...10AP Series Two Post Lifts 80 P N 5900265 Rev A6 December 2022 ...
Страница 81: ...10AP Series Two Post Lifts 81 P N 5900265 Rev A6 December 2022 ...
Страница 82: ...10AP Series Two Post Lifts 82 P N 5900265 Rev A6 December 2022 ...
Страница 83: ...10AP Series Two Post Lifts 83 P N 5900265 Rev A6 December 2022 ...
Страница 84: ...10AP Series Two Post Lifts 84 P N 5900265 Rev A6 December 2022 ...
Страница 85: ...10AP Series Two Post Lifts 85 P N 5900265 Rev A6 December 2022 ...
Страница 86: ...10AP Series Two Post Lifts 86 P N 5900265 Rev A6 December 2022 ...
Страница 87: ...10AP Series Two Post Lifts 87 P N 5900265 Rev A6 December 2022 ...
Страница 88: ...10AP Series Two Post Lifts 88 P N 5900265 Rev A6 December 2022 ...
Страница 89: ...10AP Series Two Post Lifts 89 P N 5900265 Rev A6 December 2022 ...
Страница 90: ...10AP Series Two Post Lifts 90 P N 5900265 Rev A6 December 2022 ...
Страница 91: ...10AP Series Two Post Lifts 91 P N 5900265 Rev A6 December 2022 ...
Страница 92: ...10AP Series Two Post Lifts 92 P N 5900265 Rev A6 December 2022 ...
Страница 93: ...10AP Series Two Post Lifts 93 P N 5900265 Rev A6 December 2022 ...
Страница 95: ...10AP Series Two Post Lifts 95 P N 5900265 Rev A6 December 2022 Maintenance Log ...
Страница 96: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 by BendPak Inc All rights reserved bendpak com ...