3 Installation
(4) Install the switch box
1. Open the control box and connect the connectors
with the lead cable from the light head and the other
lead cable from the power supply box.
2. Attach the control box as shown in figure below.
Switch box
X-Calibur Cuspidor Mount (AL-D109W-XN)
Switch box
Evogue Cuspidor Mount(AL-D106G-EV)
Evogue Swing Arm Mount (AL-D106G-EV)
Switch box
Switch box
X-Calibur Swing Arm Mount (AL-D109W-X)
Orage
Black
White
Sky Blue
Pink
Light Green
Black
Brown
Brown
Red
Yellow
Green
Blue
Purple
Gray
White
Black / White
Brown / White
5P
1
8 6
4
9
Lead cable from
power supply box
Lead cable from
light head
41
Содержание Bel-Nova AL-D101G
Страница 1: ...Bel Nova INSTALLATION INSTRUCTIONS...
Страница 55: ...NOTE...