4
Installation BAT-R
Release 17 12/2020
Installation
Checking the package contents
Installing and grounding the device
2.2.1 Installing the device onto the DIN rail
2.2.2 Mounting on a vertical flat surface
2.2.3 Grounding the device
Installing an SFP transceiver (optional)
Installing the antennas
Connecting the terminal blocks (optional)
2.5.1 Supply voltage with the characteristic value C
(24 V DC ... 48 V DC)
2.5.2 Supply voltage with the characteristic value K
(60 V DC ... 250 V DC / 110 V AC ... 230 V AC,
50 Hz ... 60 Hz)
2.5.3 Supply voltage with the characteristic value W
(24 V DC)
2.5.4 Signal contact
Operating the device
2.6.1 Connecting the power supply through a terminal
block
2.6.2 Connecting the power supply through PoE
Connecting data cables
2.7.1 Gigabit combo port
2.7.2 10/100/1000 Mbit/s twisted-pair connection (optional)
Making basic settings
First login (Password change)
Obtaining compliance for operation in the
European Union
Configuring the transmit power
Configuring the transmit power for the 4.9 GHz
band
Maintenance and service
Содержание Hirschmann OpenBAT BAT-R
Страница 55: ...Installation BAT R Release 17 12 2020 55 To save the value click the Send button ...
Страница 76: ......