Installation BAT-R
Release 17 12/2020
39
2.2.1
Installing the device onto the DIN rail
To mount the device onto a horizontally mounted 35 mm DIN rail according
to DIN EN 60715, proceed as follows:
Slide the upper snap-in guide of the device into the DIN rail.
Pull the rail lock slide down using a screwdriver, and press the lower part
of the device against the DIN rail.
Snap in the device by releasing the rail lock slide.
2.2.2
Mounting on a vertical flat surface
You have the option of attaching the device to a vertical flat surface. This
requires a wall mounting plate, which you purchase as a separate accessory.
The wall mounting plate is provided with a Mounting Note that takes you
through the mounting procedure.
2.2.3
Grounding the device
The device is grounded via the separate ground screw.
The device variants featuring supply voltage with characteristic value C
(24 V DC ... 48 V DC) and K (60 V DC ... 250 V DC / 110 V AC ... 230 V AC,
50 Hz ... 60 Hz) have a connection for protective ground.
The device variants featuring supply voltage with characteristic value W
(24 V DC) have a connection for functional ground.
Ground the device via the ground screw.
The ground screw is surrounded by overlay material. Make sure that the
overlay material does not prevent a solid metal to metal main protective
earthing connection. If needed remove a section of the overlay material to
ensure a reliable main protective earthing connection.
Содержание Hirschmann OpenBAT BAT-R
Страница 55: ...Installation BAT R Release 17 12 2020 55 To save the value click the Send button ...
Страница 76: ......