10
Installation BAT-R
Release 17 12/2020
Device casing
Only technicians authorized by the manufacturer are permitted to open
the casing.
Never insert pointed objects (narrow screwdrivers, wires, etc.) into the
device or into the connection terminals for electric conductors. Do not
touch the connection terminals.
Keep the ventilation slits free to ensure good air circulation.
Mount the device in the vertical position.
At ambient air temperatures > +140 °F (+60 °C):
The surfaces of the device housing may become hot. Avoid touching
the device while it is operating.
Qualification requirements for personnel
Only allow qualified personnel to work on the device.
Qualified personnel have the following characteristics:
Qualified personnel are properly trained. Training as well as practical
knowledge and experience make up their qualifications. This is the
prerequisite for grounding and labeling circuits, devices, and systems
in accordance with current standards in safety technology.
Qualified personnel are aware of the dangers that exist in their work.
Qualified personnel are familiar with appropriate measures against
these hazards in order to reduce the risk for themselves and others.
Qualified personnel receive training on a regular basis.
National and international safety regulations
Verify that the electrical installation meets local or nationally applicable
safety regulations.
When installing antennas, observe the regulations of the country in
which you are operating the WLAN device with regard to the general
operating permission and the maximum emission levels.
Install and operate this equipment with a minimum distance of
19.7 inches (50 cm) between the antenna and your body.
Grounding the device
Grounding the device is by means of a separate ground connection on the
device.
Ground the device before connecting any other cables.
Disconnect the grounding only after disconnecting all other cables.
The overall shield of a connected shielded twisted pair cable is connected
to the grounding connector on the front panel as a conductor.
Содержание Hirschmann OpenBAT BAT-R
Страница 55: ...Installation BAT R Release 17 12 2020 55 To save the value click the Send button ...
Страница 76: ......