Installation BAT-R
Release 17 12/2020
17
Notes for Germany (DE), Ireland (IE), and the United Kingdom (UK):
Operation in the 5.8 GHz band at a radiated power (EIRP) >25 mW is
subject to meeting the following conditions:
Germany (DE)
Frequency range: 5725 MHz to 5875 MHz
Condition: The usage of this band is restricted to commercial public
telecommunication services. Registration at the Federal Network
Agency is required.
Name and website of the competent authority:
Bundesnetzagentur
Ireland (IE)
Frequency range: 5725 MHz to 5875 MHz
Condition: Registration of operational base stations
Name and website of the competent authority:
Commission for Communications Regulation
www.comreg.ie
United Kingdom (UK):
Frequency range: 5725 MHz to 5850 MHz
Condition: Light-licensing regime
Name and website of the competent authority:
Ofcom
www.ofcom.org.uk
LED or laser components
LED or LASER components according to IEC 60825-1 (2014):
CLASS 1 LASER PRODUCT
CLASS 1 LED PRODUCT
DE IE UK
Содержание Hirschmann OpenBAT BAT-R
Страница 55: ...Installation BAT R Release 17 12 2020 55 To save the value click the Send button ...
Страница 76: ......