38
Installation BAT-R
Release 17 12/2020
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install the device:
Installing and grounding the device
Installing an SFP transceiver (optional)
Connecting the terminal blocks (optional)
2.1
Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 71
Check the individual parts for transport damage.
2.2
Installing and grounding the device
WARNING
FIRE HAZARD
If you connect the device to a power supply that does
NOT
meet the
requirements for Limited Power Source, NEC Class 2 or PS2 according to
IEC/EN 62368-1 and is
NOT
limited to 100 W output power, the device
must be installed in either a switch cabinet or other fire enclosure.
The fire enclosure can be made of metal or plastic with fire-protection
properties of at least V-1 according to IEC 60695-11-10. Bottom openings
of the fire enclosure must
NOT
exceed 2 mm in diameter.
Failure to follow this instruction can result in death, serious injury, or
equipment damage.