INSTALLATION AND STARTUP
3-16
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL220
Chapter 3 Getting Started
FreeStyler® Position Considerations
Note:
Using the previously stated considerations and the site overview, determine if the machine needs to be
installed off-center from the doors, and/or if either side arm will need to be de-stroked to maintain
clearance. Record the information below.
Considering the length, width and height issues previously discussed, answer the following questions.
Summary of Width Considerations
Record Here
P
From centerline of door to the passenger side wall
D
From centerline of door to the driver side wall
I will need to de-stroke the passenger side arm
YES
NO
I will need to de-stroke the driver side arm
YES
NO
I would like to align the center of the rails to the center of the doors
YES
NO
If not, shift the center of the rails towards the….
Driver side
Passenger side
How Far (inches)
Summary of Length Considerations
Record Here
What is the maximum length vehicle you plan to wash?
4-Legged Frame:
Treadle and vehicle should be set to factory spec of 9” behind entrance
side of exit 4 x 6 leg
YES
NO
6-Legged Frame:
Treadle and vehicle should be set to factory spec of 49” behin
d entrance
side of exit 4 x 6 leg
YES
NO
If no, will I move the Treadle forward (toward the exit)?
YES
NO
How Far (inches)
Will I have to move the End Limit Stop?
YES
NO
How Far (inches)
Will I need “Small Bay” software?
YES
NO
Using the above width and length consideration charts and the two layout drawings, determine the exit
leg position in the bay.
Note:
The head beams are 190” long and made for buildings 16’-0” (192”) or greater. If P + D is less
than 192” in the area of the head beams, they must be cut to a length 2” shorter than P + D.
Содержание FreeStyler
Страница 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Страница 2: ......
Страница 4: ......
Страница 12: ......
Страница 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Страница 14: ......
Страница 26: ......
Страница 27: ... Chapter 2 Recommended Installation Sequence Checklist Chapter 2 Recommended Installation Sequence Checklist ...
Страница 28: ......
Страница 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Страница 32: ......
Страница 52: ......
Страница 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Страница 54: ......
Страница 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Страница 124: ......
Страница 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Страница 136: ......
Страница 142: ......
Страница 143: ... Chapter 7 Chemical Delivery and Pumping Station Chapter 7 Chemical Delivery and Pumping Station ...
Страница 144: ......
Страница 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Страница 152: ......
Страница 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Страница 164: ......
Страница 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Страница 168: ......
Страница 174: ......
Страница 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Страница 176: ......
Страница 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Страница 184: ......
Страница 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Страница 192: ......
Страница 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Страница 206: ......
Страница 226: ......
Страница 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Страница 250: ......
Страница 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Страница 254: ......
Страница 258: ......
Страница 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Страница 260: ......
Страница 264: ......
Страница 265: ... Chapter 19 Trades Chapter 19 Trades ...
Страница 266: ......
Страница 270: ......
Страница 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Страница 272: ......
Страница 282: ......
Страница 283: ... Chapter 21 Pneumatic and Hydraulic Connections Chapter 21 Pneumatic and Hydraulic Connections ...
Страница 284: ......
Страница 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Страница 294: ......
Страница 320: ......
Страница 321: ......