INSTALLATION AND STARTUP
1MANUL220
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
3-17
Chapter 3 Getting Started
Skilled Trades
Begin by referencing the startup checklist and supplied electrical drawings. You will notice that all
the first items focus on placement of electrical equipment. This is done so that you can get your
electrician started on the job as soon as possible. Typically, the electrical portion of the installation
is the most substantial.
Second to that is the plumbing work that must be performed. Our installation sequence is outlined
to get both trades started as soon as possible.
Equipment Locations
There are some variables that must be thoroughly understood prior to placement and installation
of the equipment. These variables are typically addressed in your site-specific drawings, supplied
by an Architect or your Belanger® Representative.
Some of the variables to consider prior to installing the equipment include:
•
Bay Length:
The length of the bay can vary considerably and have a dramatic effect on equipment
placement. For example, a very short bay may force signage to be installed outside the building.
•
Bay Width and Height:
There is no maximum bay width or height, but there are minimum requirements
to install a FreeStyler®.
Reference the Support Documents included at the end of this manual to assist with installation.
Use the drawing diagram that best fits your site layout. If your layout is not represented in these
diagrams and/or you do not have site specific drawings, please contact your Belanger®
Representative or Belanger® Technical Support at 248-349-7010 for assistance.
•
Door Width and Centerline of Building -
Although rare, door widths less than 10 feet can affect
equipment placement and overall site performance. In cases where the door is not on centerline with
the building, equipment placement can be affected.
•
Back Room Equipment -
There is some flexibility when installing back-room support equipment, but
keep in mind the following guidelines. Short runs from the Pumping Station and Solution Delivery
Modules optimize performance. Proper equipment placement can reduce utility costs and minimize
obstacles. Typical equipment found in the back room includes: FreeStyler® Electrical Panels, Pumping
Station, SDM Solution Delivery Pumps, Water Softener, Spot Free (RO) System with Tank, and an Air
Compressor. Additionally, the backroom may also have to accommodate a Boiler for hot water, a boiler
for slab heat, and/or a reclaim system. Placement of these items is just as important as the equipment in
the bay; therefore, you should plan accordingly.
Establishing an Origin in the Bay
The placement of the FreeStyler® in the bay requires several considerations. Allow space for the
Undercarriage Wash, Photo-Eyes, Support Legs, manifold travel, signage, drip space, and doors.
Reference clearance requirements on the Support Documents included at the end of this manual
for further details.
Содержание FreeStyler
Страница 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Страница 2: ......
Страница 4: ......
Страница 12: ......
Страница 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Страница 14: ......
Страница 26: ......
Страница 27: ... Chapter 2 Recommended Installation Sequence Checklist Chapter 2 Recommended Installation Sequence Checklist ...
Страница 28: ......
Страница 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Страница 32: ......
Страница 52: ......
Страница 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Страница 54: ......
Страница 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Страница 124: ......
Страница 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Страница 136: ......
Страница 142: ......
Страница 143: ... Chapter 7 Chemical Delivery and Pumping Station Chapter 7 Chemical Delivery and Pumping Station ...
Страница 144: ......
Страница 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Страница 152: ......
Страница 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Страница 164: ......
Страница 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Страница 168: ......
Страница 174: ......
Страница 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Страница 176: ......
Страница 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Страница 184: ......
Страница 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Страница 192: ......
Страница 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Страница 206: ......
Страница 226: ......
Страница 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Страница 250: ......
Страница 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Страница 254: ......
Страница 258: ......
Страница 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Страница 260: ......
Страница 264: ......
Страница 265: ... Chapter 19 Trades Chapter 19 Trades ...
Страница 266: ......
Страница 270: ......
Страница 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Страница 272: ......
Страница 282: ......
Страница 283: ... Chapter 21 Pneumatic and Hydraulic Connections Chapter 21 Pneumatic and Hydraulic Connections ...
Страница 284: ......
Страница 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Страница 294: ......
Страница 320: ......
Страница 321: ......