
INSTALLATION AND STARTUP
1-4
Belanger, Inc.® * PO BOX 5470. * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL220
Chapter 1 Introduction
IMPORTANT Safety Information
– MUST READ
Safety Warnings
DISCONNECT THE MAIN POWER SUPPLY AND
DISSIPATE ALL POTENTIALLY HAZARDOUS
ENERGY SOURCES PRIOR TO SERVICING OR
MAINTAINING EQUIPMENT
Belanger® recommends that all workers observe the OSHA (U.S. Department of
Labor Occupational Safety & Health Administration) Lockout / Tagout procedure
to dissipate all potentially hazardous energy sources (i.e. - electrical, mechanical,
hydraulic, pneumatic, chemical, thermal, etc.) prior to performing service or
maintenance on machinery and equipment.
Note:
Reference the OSHA standard for the Control of Hazardous Energy (Lockout/Tagout), Title 29
Code of Federal Regulations (CFR) Part 1910.147 and the example provided in 1910.147 Appendix
A for practices and procedures necessary to disable machinery or equipment, thereby preventing
the release of hazardous energy while employees perform servicing and maintenance activities. The
standard outlines measures for controlling hazardous energies – electrical, mechanical, hydraulic,
pneumatic, chemical, thermal, and other energy sources.
Note:
Reference the OSHA standard 29 CFR 1910.331 to 29 CFR 1910.335 for safe work practices to
protect employees working on electrical circuits and equipment. This section requires workers to
use safe work practices, including lockout and tagging procedures. These provisions apply when
employees are exposed to electrical hazards while working on, near, or with conductors or systems
that use electrical energy.
Note:
Both referenced OSHA standards can be found at the following website:
. Browse to the General Industry tab under the Find an OSHA Standard heading, scroll
down to the link of interest and click on it.
Doing so will prevent unexpected energization, startup, or release of hazardous
energy while maintenance and servicing activities are being performed.
Содержание FreeStyler
Страница 1: ...FreeStyler Installation Startup FreeStyler Installation Startup 1MANUAL220 Rev14 ...
Страница 2: ......
Страница 4: ......
Страница 12: ......
Страница 13: ... Chapter 1 Introduction Chapter 1 Introduction ...
Страница 14: ......
Страница 26: ......
Страница 27: ... Chapter 2 Recommended Installation Sequence Checklist Chapter 2 Recommended Installation Sequence Checklist ...
Страница 28: ......
Страница 31: ... Chapter 3 Getting Started Chapter 3 Getting Started ...
Страница 32: ......
Страница 52: ......
Страница 53: ... Chapter 4 Frame and Carriage Assembly Chapter 4 Frame and Carriage Assembly ...
Страница 54: ......
Страница 123: ... Chapter 5 Entrance and Exit Photo Eyes Chapter 5 Entrance and Exit Photo Eyes ...
Страница 124: ......
Страница 135: ... Chapter 6 Treadle Assembly Chapter 6 Treadle Assembly ...
Страница 136: ......
Страница 142: ......
Страница 143: ... Chapter 7 Chemical Delivery and Pumping Station Chapter 7 Chemical Delivery and Pumping Station ...
Страница 144: ......
Страница 151: ... Chapter 8 MixStir Options Chapter 8 MixStir Options Triple Foam and High Pressure Wax ...
Страница 152: ......
Страница 163: ... Chapter 9 Reclaim Water Adapter Kit Option Chapter 9 Reclaim Water Adapter Kit Option ...
Страница 164: ......
Страница 167: ... Chapter 10 Booster Pump Assembly Option Chapter 10 Booster Pump Assembly Option ...
Страница 168: ......
Страница 174: ......
Страница 175: ... Chapter 11 Bug Spray Applicator Option Chapter 11 Bug Spray Applicator Option ...
Страница 176: ......
Страница 183: ... Chapter 12 Undercarriage Options Chapter 12 Undercarriage Options ...
Страница 184: ......
Страница 191: ... Chapter 13 Water Softener Option Chapter 13 Water Softener Option ...
Страница 192: ......
Страница 205: ... Chapter 14 HydroBlade Assembly Option Chapter 14 HydroBlade Assembly Option ...
Страница 206: ......
Страница 226: ......
Страница 249: ... Chapter 16 Signage Options Chapter 16 Signage Options ...
Страница 250: ......
Страница 253: ... Chapter 17 Onboard Dryer Option Chapter 17 Onboard Dryer Option ...
Страница 254: ......
Страница 258: ......
Страница 259: ... Chapter 18 Spot Free Rinse R O Option Chapter 18 Spot Free Rinse R O Option ...
Страница 260: ......
Страница 264: ......
Страница 265: ... Chapter 19 Trades Chapter 19 Trades ...
Страница 266: ......
Страница 270: ......
Страница 271: ... Chapter 20 Electrical Chapter 20 Electrical ...
Страница 272: ......
Страница 282: ......
Страница 283: ... Chapter 21 Pneumatic and Hydraulic Connections Chapter 21 Pneumatic and Hydraulic Connections ...
Страница 284: ......
Страница 293: ... Chapter 22 Initial Startup Chapter 22 Initial Startup ...
Страница 294: ......
Страница 320: ......
Страница 321: ......