Appendix
Operating manual AVERO Phoenix
V2.1 E
Page 26 of 35
13.4 Wiring diagram
Pre-site safety measure!
Close valves for cold and warm
water. Please comply with local
rules and regulations for electrical
systems in wet and humid rooms.
Pre-Installed connection
–
Sanitary - Electric
Warm-water connection ¾ ", set female threading tile-
even. Assemble hexagon-nipple, elbow 90°, ball valve,
strainer and rosette (see details illustration Pos.1 und 2).
Cold-water connection ¾ ", set female threading tile-
even. Assemble hexagon-nipple, elbow 90°, ball valve,
strainer and rosette (Details illustration Pos.1 und 2).
Wall drain DN 50, tile-even.
Junction-box (min. IP X5), 230 V/50 Hz, 1, 5 mm², fuse
protection 16 A.
Содержание AVERO Phoenix
Страница 24: ...Appendix Operating manual AVERO Phoenix V2 1 E Page 24 of 35 13 2 Dimensions of the AVERO Phoenix 190...
Страница 25: ...Appendix Operating manual AVERO Phoenix V2 1 E Page 25 of 35 13 3 Dimensions of the AVERO Phoenix 170...
Страница 27: ...Appendix Operating manual AVERO Phoenix V2 1 E Page 27 of 35 13 5 Declaration of Conformity...
Страница 35: ...BEKA Hospitec GmbH Am R benmorgen 3 35582 Wetzlar Germany Phone Fax 49 0 6 41 9 22 20 0...