Commissioning Check Sheet
Electrical and Water supply:
Power supply to Gas control cabinet is connected and turned on.
If the exhaust system is fan forced, ensure that the fan is running and rotating the correct direction.
Check for suction
(draw)
at oven spigot.
Where applicable, check that the Spray Filter is correctly installed and functioning correctly.
(Spray Filter)
Water connected and on.
(Spray Filter)
Power connected and on.
(Spray Filter)
Water present at Tundish when operational.
Gas Pressures:
All relevant Gas supply is correctly connected to the Gas control cabinet, the flexible gas tube is
connected securely to the correct burner and the manual valves are open
(On).
Check for leaks.
Check gas pressures with all burners operating and at least 80% of all gas appliances in kitchen
operating.
Check the Flame size and colour to make sure the correct gas pressures are calibrated.
Check High and Low Flame settings on all burners.
Check that the Inspirator(s) is correctly calibrated to give the correct flame colour and size.
General Commissioning check:
(Australia Only)
Check Interlock Thermocouple is correctly installed and functioning correctly.
Check that the flue is installed and compliant with local regulation.
Check that there is sufficient ventilation below the oven.
Check that the Thermocouple is fitted correctly, flush with the oven base.
Check that the System Damper is calibrated correctly and sufficient balance is achieved in the flue.
Check that all areas are clean and tidy both below and above the oven. Remove any debris from oven
area.
Check the Cool Air Make-up device function.
Cool Air Make-up connected to outside air source.
Operator Training:
How to work the oven.
□
Preheat instructions.
□
Insert Plug Door correctly.
Gas safety
– How to isolate gas supply to the oven if the smell of gas is detected near the oven.
Starting sequence
– Check power/gas, Canopy/Fan on, Check heat-up.
Digital Temperature controller operation.
Maintenance and flue cleaning required 3/6 monthly.
(Maintenance schedule in Installation and
Operation Manual outlined and explained)
Warranty card returned.
Installation and Operation Manual has been received by the client.