![Baxi LINA 3 COMFORT HT Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/baxi/lina-3-comfort-ht/lina-3-comfort-ht_instruction-manual_2711793074.webp)
74
926.420.3 - EN
INSTRUCTIONS FOR FITTERS
This boiler has been designed in full compliance with European reference standards and, in particular, it is fitted with the
following:
• Safety thermostat
By means of a sensor placed on the heating delivery line, the thermostat interrupts the flow of gas to the burner if the
water in the primary circuit overheats. In these conditions, the boiler is blocked and only after the fault has been eliminated
will it be possible to light it again by pressing the
OK
button (section 9.1).
It is forbidden to disable this safety device
• NTC fumes probe
This device is positioned on the fumes-water exchanger.
The electronic board blocks the flow of gas to the burner if the temperature exceeds 110°C.
Press the
OK
button (section 9.1) to re-establish normal operating conditions.
N.B.: the above reset operation is only possible if the temperature is less than 90°C.
It is forbidden to disable this safety device
• Flame ionisation detector
The flame sensing electrode guarantees safety of operation in case of gas failure or incomplete ignition of the main bur-
ner.
In these conditions, the boiler blocks.
Press the
OK
button (section 9.1) to re-establish normal operating conditions.
• Hydraulic pressure switch
This device allows the main burner to be ignited only if system pressure is higher than 0.5 bars.
• Pump post-circulation
The electronically-controlled pump post-circulation function lasts 3 minutes and is enabled, in the heating mode, if the
ambient thermostat causes the main burner to go out.
• Frost protection device
The electronic boiler management system includes a “frost protection” function in the heating and DHW modes which,
if delivery temperature falls below 5°C, operates the burner until a delivery temperature of 30°C is reached.
This function is enabled when the boiler is switched on, the gas supply is open and the system is correctly pressurised.
• Anti-block pump function
If no heat demand is received in the heating and/or DHW modes for 24 consecutive hours, the pump will automatically
start and operate for 10 seconds.
• Three-way valve anti-blockage function
If no heat demand is received for a period of 24 hours, the three-way valve performs a complete switching cycle.
• Hydraulic safety valve (heating circuit)
This device is set to 3 bar and is used for the heating circuit.
• Heating pump pre-circulation
In case of a heat demand in the heating mode, the appliance can pre-circulate the pump before the burner is ignited. This
pre-circulation phase last from 0 to a few minutes, depending on the operating temperature and installation conditions.
Connect the safety valve to a drain trap. Do not use it to drain the heating circuit.
N.B.:
the functions performed by the adjustment and safety devices are only operative if the boiler is switched on.
23. ADJUSTMENT AND SAFETY DEVICES
Содержание LINA 3 COMFORT HT
Страница 42: ...42 926 420 3 IT ISTRUZIONI DESTINATE ALL INSTALLATORE HT 1 120 HT 1 240 HT 1 280 CG_2056 0901_1502...
Страница 128: ...128 926 420 3 RU BAXI BAXI 2009 142 EC 92 42 EEC 2004 108 EC 2006 95 EC BAXI S p A CSQ ISO14001 ISO9001 OHSAS 18001...
Страница 131: ...131 926 420 3 RU 3 BAXI CLOW AVS 77 5 12 3 2 3 3 1 0702_2404 4 4 0702_2405 3 2...
Страница 133: ...133 926 420 3 RU 3 4 1 3 1 1 t 1 HW SP 3 4 1 IP PROG 1 3 5 PROG OK OK Day 1 7 IP 3 6 1 4 4 3 6...
Страница 138: ...138 926 420 3 RU 10 10 45 90 02 2 47 47 DD 02 2 45 1 4 4 2 PARTY MAN 60 4 4 1 0703_0507 60...
Страница 140: ...140 926 420 3 RU 8 15 20 5 30 ERROR 9 2 ERROR 2 ERROR 5 AVS 77 155 0703_0904 RESET 4 4 0705_0601 CG_1922 RESET...
Страница 147: ...147 926 420 3 RU 15 4 15 5 0704_1507 L max 15 m 0706_2902 0706_2903 L max 14 m L max 15 m 0706_2904 1 L1 L2 max 80 m 15...
Страница 150: ...150 926 420 3 RU 11 1 a b 11 2 2 11 3 1 2 4 17 17 2 0705_1602 M2 18 3 4 12 0605_1604 M2...
Страница 153: ...153 926 420 3 RU 20 14 AVS 77 16 14 AVS 77 0709_0701 CG_1933 1 AVS 77 1 1 2 3 N...
Страница 158: ...158 926 420 3 RU OK 9 1 110 OK 9 1 90 OK 9 1 0 5 3 5 30 0 5 24 10 24 3 0 1 1 0 23...
Страница 159: ...159 926 420 3 RU 24 25 2 2 18 020429_0300 21 OF 555 0 OF 555 0 1 15 15 OF 555 0 0 25 1 17 CG_2190 0911_1201...
Страница 164: ...164 926 420 3 RU 1 setpoint setpoint setpoint setpoint AMBON RMOD AMBON RMOD T AMBON RMOD EXT T 0 0 1 1 1 1 0...
Страница 167: ...167 926 420 3 RU 0901_1506 CG_1934B 32 N R G V B V HT 280 HT 330 NTC RESET NTC...
Страница 168: ...168 926 420 3 RU 0901_1503 CG_2056 HT 1 120 HT 1 240 HT 1 280 N R G V B V RESET NTC...
Страница 340: ...340 926 420 3 EL GR BAXI CE 2009 142 92 42 2004 108 2006 95 S p A CSQ ISO9001 ISO14001 OHSAS18001 BAXIS p A...
Страница 344: ...344 926 420 3 EL GR 4 2 3 1 2 COOL 31 COOL 31 3 2 COMFORT 3 6 ff 3 3 25 25 50 50 75 75 100...
Страница 345: ...345 926 420 3 EL GR 3 4 1 3 1 1 C tAMB 1 C HW SP C 3 4 1 IP PROG 1 OK OK Day 1 7 3 5 PROG 3 6 1 4 4 3 6...
Страница 350: ...350 926 420 3 EL GR 10 10 45 90 HH 02 2 47 47 DD 02 2 45 1 0703_0507 60 4 4 2 PARTY MAN MM 60 4 4 1 AMB...
Страница 352: ...352 926 420 3 EL GR 8 5 C 30 C ERROR E 9 2 ERROR 2 reset RESET AVS 77 0703_0904 155E RESET 4 4 0705_0601 CG_1922 RESET...
Страница 362: ...362 926 420 3 EL GR E 11 1 a b 11 2 M2 3 1 2 4 C 17 17 2 0705_1602 M2 18 3 4 12 0605_1604 M2...
Страница 365: ...365 926 420 3 EL GR 20 14 0709_0701 CG_1933 1 AVS 77 AVS 77 16 14 AVS 77 1 1 2 3 N...
Страница 370: ...370 926 420 3 EL GR OK 9 1 NTC 110 C OK 9 1 90 C OK 9 1 0 5 bar 3 5 C 30 C 24 10 24 3 bar 0 23...
Страница 371: ...371 926 420 3 EL GR 24 25 O2 CO2 CO 18 020429_0300 21 OF 555 0 OF 555 0 1 15 OF 555 0 0 25 1 17 CG_2190 0911_1201...
Страница 376: ...376 926 420 3 EL GR AMBON RMOD EXT T AMBON RMOD EXT T 0 0 COMFORT 1 1 1 1 0...
Страница 379: ...379 926 420 3 EL GR 0901_1506 CG_1934B 32 C M N R G V B G HT 240 HT 280 HT 330 NTC NTC RESET NTC FASTON...
Страница 380: ...380 926 420 3 EL GR 0901_1503 CG_2056 HT 1 120 HT 1 240 HT 1 280 BOILER C M N R G V B G NTC NTC RESET FASTON...
Страница 382: ...382 926 420 3 EL GR...
Страница 383: ...383 926 420 3 EL GR...