![Baxi LINA 3 COMFORT HT Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/baxi/lina-3-comfort-ht/lina-3-comfort-ht_instruction-manual_2711793061.webp)
61
926.420.3 - EN
INSTRUCTIONS FOR FITTERS
0704_1511
C
33
C
33
C
13
C
13
C
43
C
53
C
83
Figure 8
Precautions for the following installation types:
C
13
, C
33
The terminals for separate flues must be fitted inside a 50 cm square.
Detailed instructions are provided with the individual accessories
C
53
Do not fit the flue and air duct terminals on opposite walls of the buil-
ding.
C
63
The pressure drop of the ducts must not exceed 100 Pa. The ducts
must be certified for this specific use and for a temperature in excess
of 100°C. The flue terminal must be certified EN 14471.
C
43
, C
83
The flue terminal or flue duct must be suitable for the purpose.
CAUTION
To optimise operating safety, make sure the flue ducts are firmly fixed to
the wall with suitable brackets.
… COAXIAL FLUE-AIR DUCT (CONCENTRIC)
990519_0400
Concentric adaptor
This type of duct is used to discharge exhaust fumes and draw combustion
air both outside the building and if a LAS flue is fitted.
The 90° coaxial bend allows the boiler to be connected to a flue-air duct
in any direction as it can be rotated by 360°. It can also be used as a
supplementary bend combined with a coaxial duct or a 45° bend.
If fumes are discharged outside the building, the flue-air duct must
protrude at least 18mm from the wall to allow an aluminium weathering
surround to be fitted and sealed to avoid water infiltrations.
Make sure there is a minimum downward slope of 5 cm per metre of duct
towards the boiler.
A 90° bend reduces total duct length by 1 metre.
A 45° bend reduces total duct length by 0.5 metre
15.1 Ø 60/100 HORIZONTAL FLUE TERMINAL INSTALLATION OPTIONS
0704_1510
L max = 10 m Ø 60/100 mm
L max = 25 m Ø 80/125 mm
L max = 9 m Ø 60/100 mm
L max = 24 m Ø 80/125 mm
Содержание LINA 3 COMFORT HT
Страница 42: ...42 926 420 3 IT ISTRUZIONI DESTINATE ALL INSTALLATORE HT 1 120 HT 1 240 HT 1 280 CG_2056 0901_1502...
Страница 128: ...128 926 420 3 RU BAXI BAXI 2009 142 EC 92 42 EEC 2004 108 EC 2006 95 EC BAXI S p A CSQ ISO14001 ISO9001 OHSAS 18001...
Страница 131: ...131 926 420 3 RU 3 BAXI CLOW AVS 77 5 12 3 2 3 3 1 0702_2404 4 4 0702_2405 3 2...
Страница 133: ...133 926 420 3 RU 3 4 1 3 1 1 t 1 HW SP 3 4 1 IP PROG 1 3 5 PROG OK OK Day 1 7 IP 3 6 1 4 4 3 6...
Страница 138: ...138 926 420 3 RU 10 10 45 90 02 2 47 47 DD 02 2 45 1 4 4 2 PARTY MAN 60 4 4 1 0703_0507 60...
Страница 140: ...140 926 420 3 RU 8 15 20 5 30 ERROR 9 2 ERROR 2 ERROR 5 AVS 77 155 0703_0904 RESET 4 4 0705_0601 CG_1922 RESET...
Страница 147: ...147 926 420 3 RU 15 4 15 5 0704_1507 L max 15 m 0706_2902 0706_2903 L max 14 m L max 15 m 0706_2904 1 L1 L2 max 80 m 15...
Страница 150: ...150 926 420 3 RU 11 1 a b 11 2 2 11 3 1 2 4 17 17 2 0705_1602 M2 18 3 4 12 0605_1604 M2...
Страница 153: ...153 926 420 3 RU 20 14 AVS 77 16 14 AVS 77 0709_0701 CG_1933 1 AVS 77 1 1 2 3 N...
Страница 158: ...158 926 420 3 RU OK 9 1 110 OK 9 1 90 OK 9 1 0 5 3 5 30 0 5 24 10 24 3 0 1 1 0 23...
Страница 159: ...159 926 420 3 RU 24 25 2 2 18 020429_0300 21 OF 555 0 OF 555 0 1 15 15 OF 555 0 0 25 1 17 CG_2190 0911_1201...
Страница 164: ...164 926 420 3 RU 1 setpoint setpoint setpoint setpoint AMBON RMOD AMBON RMOD T AMBON RMOD EXT T 0 0 1 1 1 1 0...
Страница 167: ...167 926 420 3 RU 0901_1506 CG_1934B 32 N R G V B V HT 280 HT 330 NTC RESET NTC...
Страница 168: ...168 926 420 3 RU 0901_1503 CG_2056 HT 1 120 HT 1 240 HT 1 280 N R G V B V RESET NTC...
Страница 340: ...340 926 420 3 EL GR BAXI CE 2009 142 92 42 2004 108 2006 95 S p A CSQ ISO9001 ISO14001 OHSAS18001 BAXIS p A...
Страница 344: ...344 926 420 3 EL GR 4 2 3 1 2 COOL 31 COOL 31 3 2 COMFORT 3 6 ff 3 3 25 25 50 50 75 75 100...
Страница 345: ...345 926 420 3 EL GR 3 4 1 3 1 1 C tAMB 1 C HW SP C 3 4 1 IP PROG 1 OK OK Day 1 7 3 5 PROG 3 6 1 4 4 3 6...
Страница 350: ...350 926 420 3 EL GR 10 10 45 90 HH 02 2 47 47 DD 02 2 45 1 0703_0507 60 4 4 2 PARTY MAN MM 60 4 4 1 AMB...
Страница 352: ...352 926 420 3 EL GR 8 5 C 30 C ERROR E 9 2 ERROR 2 reset RESET AVS 77 0703_0904 155E RESET 4 4 0705_0601 CG_1922 RESET...
Страница 362: ...362 926 420 3 EL GR E 11 1 a b 11 2 M2 3 1 2 4 C 17 17 2 0705_1602 M2 18 3 4 12 0605_1604 M2...
Страница 365: ...365 926 420 3 EL GR 20 14 0709_0701 CG_1933 1 AVS 77 AVS 77 16 14 AVS 77 1 1 2 3 N...
Страница 370: ...370 926 420 3 EL GR OK 9 1 NTC 110 C OK 9 1 90 C OK 9 1 0 5 bar 3 5 C 30 C 24 10 24 3 bar 0 23...
Страница 371: ...371 926 420 3 EL GR 24 25 O2 CO2 CO 18 020429_0300 21 OF 555 0 OF 555 0 1 15 OF 555 0 0 25 1 17 CG_2190 0911_1201...
Страница 376: ...376 926 420 3 EL GR AMBON RMOD EXT T AMBON RMOD EXT T 0 0 COMFORT 1 1 1 1 0...
Страница 379: ...379 926 420 3 EL GR 0901_1506 CG_1934B 32 C M N R G V B G HT 240 HT 280 HT 330 NTC NTC RESET NTC FASTON...
Страница 380: ...380 926 420 3 EL GR 0901_1503 CG_2056 HT 1 120 HT 1 240 HT 1 280 BOILER C M N R G V B G NTC NTC RESET FASTON...
Страница 382: ...382 926 420 3 EL GR...
Страница 383: ...383 926 420 3 EL GR...