![Baxi LINA 3 COMFORT HT Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/baxi/lina-3-comfort-ht/lina-3-comfort-ht_instruction-manual_2711793046.webp)
46
926.420.3 - EN
INSTRUCTIONS FOR USERS
Initial lighting of the boiler must be carried out by an authorised Service Engineer who must first ensure that:
a) the rated data correspond to the supply (electricity, water and gas) data;
b) the installation complies with current laws and regulations;
c) the appliance is correctly connected to the power supply and earthed.
The names of the authorised Service Centres are indicated in the attached sheet.
Failure to observe the above will render the guarantee null and void.
Prior to commissioning, remove the protective plastic coating from the boiler. Do not use any tools or abrasive detergents
to do this as you may damage the painted surfaces.
The instructions shall state the substance of the following:
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concer-
ning use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
This boiler has been designed to heat water to a temperature lower than boiling point at atmospheric pressure. It must be
connected to a central heating system and to a domestic hot water supply system according to its performances and
power output. Before having the boiler installed by a qualified service engineer, make sure the following operations are
performed:
a) Make sure the boiler is adjusted to use the type of gas delivered by the gas supply. This can be verified by checking
the markings on the packaging and the rating plate on the appliance.
b) Make sure the flue terminal draft is appropriate, that the terminal is not obstructed and that no exhaust gases from other
appliances are expelled through the same flue duct, unless the latter has been specially designed to collect exhaust
gas from more than one appliance, in conformity with current laws and regulations.
c) Make sure that, if the flue is connected to existing flue ducts, they have been thoroughly cleaned as residual products
of combustion may detach from the walls during operation and obstruct the flue duct.
d) To ensure correct operation and maintain the warranty, observe the following precautions:
1. Hot water circuit:
1.1
. if the water is harder than 20 °F (1 °F = 10 mg calcium carbonate per litre of water), install a polyphosphate dispenser
or an equivalent treatment system, compliant with current regulations.
1.2
. the system must be thoroughly flushed after installation of the appliance and before its use.
1.3.
The materials used for the domestic hot water circuit of the product comply with Directive 98/83/EC.
2. Heating circuit
2.1. new system
Before installing the boiler, the system must be thoroughly cleaned in order to eliminate residual thread-cutting swarf,
solder and any solvents, using suitable proprietary products. To avoid damaging metal, plastic and rubber parts, use
only neutral cleaners, i.e. non-acid and non-alkaline. Recommended cleaning products: SENTINEL X300 or X400 and
FERNOX Regenerator for heating circuits. Use these products in strict compliance with the manufacturers’ instruc-
tions.
2.2. existing system:
Before installing the boiler, the system must be drained and cleaned to remove sludge and contaminants, using suitable
proprietary products as described in section 2.1.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non-alkaline such as
SENTINEL X100 and FERNOX Protector for heating circuits. Use these products in strict compliance with the manu-
facturers’ instructions.
Remember that the presence of foreign bodies in the heating system can adversely affect boiler operation (e.g. ove-
rheating and noisy operation of the heat exchanger).
Failure to observe the above will render the guarantee null and void.
1. INSTRUCTIONS PRIOR TO INSTALLATION
2. INSTRUCTIONS PRIOR TO COMMISSIONING
Содержание LINA 3 COMFORT HT
Страница 42: ...42 926 420 3 IT ISTRUZIONI DESTINATE ALL INSTALLATORE HT 1 120 HT 1 240 HT 1 280 CG_2056 0901_1502...
Страница 128: ...128 926 420 3 RU BAXI BAXI 2009 142 EC 92 42 EEC 2004 108 EC 2006 95 EC BAXI S p A CSQ ISO14001 ISO9001 OHSAS 18001...
Страница 131: ...131 926 420 3 RU 3 BAXI CLOW AVS 77 5 12 3 2 3 3 1 0702_2404 4 4 0702_2405 3 2...
Страница 133: ...133 926 420 3 RU 3 4 1 3 1 1 t 1 HW SP 3 4 1 IP PROG 1 3 5 PROG OK OK Day 1 7 IP 3 6 1 4 4 3 6...
Страница 138: ...138 926 420 3 RU 10 10 45 90 02 2 47 47 DD 02 2 45 1 4 4 2 PARTY MAN 60 4 4 1 0703_0507 60...
Страница 140: ...140 926 420 3 RU 8 15 20 5 30 ERROR 9 2 ERROR 2 ERROR 5 AVS 77 155 0703_0904 RESET 4 4 0705_0601 CG_1922 RESET...
Страница 147: ...147 926 420 3 RU 15 4 15 5 0704_1507 L max 15 m 0706_2902 0706_2903 L max 14 m L max 15 m 0706_2904 1 L1 L2 max 80 m 15...
Страница 150: ...150 926 420 3 RU 11 1 a b 11 2 2 11 3 1 2 4 17 17 2 0705_1602 M2 18 3 4 12 0605_1604 M2...
Страница 153: ...153 926 420 3 RU 20 14 AVS 77 16 14 AVS 77 0709_0701 CG_1933 1 AVS 77 1 1 2 3 N...
Страница 158: ...158 926 420 3 RU OK 9 1 110 OK 9 1 90 OK 9 1 0 5 3 5 30 0 5 24 10 24 3 0 1 1 0 23...
Страница 159: ...159 926 420 3 RU 24 25 2 2 18 020429_0300 21 OF 555 0 OF 555 0 1 15 15 OF 555 0 0 25 1 17 CG_2190 0911_1201...
Страница 164: ...164 926 420 3 RU 1 setpoint setpoint setpoint setpoint AMBON RMOD AMBON RMOD T AMBON RMOD EXT T 0 0 1 1 1 1 0...
Страница 167: ...167 926 420 3 RU 0901_1506 CG_1934B 32 N R G V B V HT 280 HT 330 NTC RESET NTC...
Страница 168: ...168 926 420 3 RU 0901_1503 CG_2056 HT 1 120 HT 1 240 HT 1 280 N R G V B V RESET NTC...
Страница 340: ...340 926 420 3 EL GR BAXI CE 2009 142 92 42 2004 108 2006 95 S p A CSQ ISO9001 ISO14001 OHSAS18001 BAXIS p A...
Страница 344: ...344 926 420 3 EL GR 4 2 3 1 2 COOL 31 COOL 31 3 2 COMFORT 3 6 ff 3 3 25 25 50 50 75 75 100...
Страница 345: ...345 926 420 3 EL GR 3 4 1 3 1 1 C tAMB 1 C HW SP C 3 4 1 IP PROG 1 OK OK Day 1 7 3 5 PROG 3 6 1 4 4 3 6...
Страница 350: ...350 926 420 3 EL GR 10 10 45 90 HH 02 2 47 47 DD 02 2 45 1 0703_0507 60 4 4 2 PARTY MAN MM 60 4 4 1 AMB...
Страница 352: ...352 926 420 3 EL GR 8 5 C 30 C ERROR E 9 2 ERROR 2 reset RESET AVS 77 0703_0904 155E RESET 4 4 0705_0601 CG_1922 RESET...
Страница 362: ...362 926 420 3 EL GR E 11 1 a b 11 2 M2 3 1 2 4 C 17 17 2 0705_1602 M2 18 3 4 12 0605_1604 M2...
Страница 365: ...365 926 420 3 EL GR 20 14 0709_0701 CG_1933 1 AVS 77 AVS 77 16 14 AVS 77 1 1 2 3 N...
Страница 370: ...370 926 420 3 EL GR OK 9 1 NTC 110 C OK 9 1 90 C OK 9 1 0 5 bar 3 5 C 30 C 24 10 24 3 bar 0 23...
Страница 371: ...371 926 420 3 EL GR 24 25 O2 CO2 CO 18 020429_0300 21 OF 555 0 OF 555 0 1 15 OF 555 0 0 25 1 17 CG_2190 0911_1201...
Страница 376: ...376 926 420 3 EL GR AMBON RMOD EXT T AMBON RMOD EXT T 0 0 COMFORT 1 1 1 1 0...
Страница 379: ...379 926 420 3 EL GR 0901_1506 CG_1934B 32 C M N R G V B G HT 240 HT 280 HT 330 NTC NTC RESET NTC FASTON...
Страница 380: ...380 926 420 3 EL GR 0901_1503 CG_2056 HT 1 120 HT 1 240 HT 1 280 BOILER C M N R G V B G NTC NTC RESET FASTON...
Страница 382: ...382 926 420 3 EL GR...
Страница 383: ...383 926 420 3 EL GR...